首页> 外国专利> Application manner null of the post cylinder levee crown level adjustment structure in the building construction which utilizes the post in the cylinder

Application manner null of the post cylinder levee crown level adjustment structure in the building construction which utilizes the post in the cylinder

机译:利用圆柱体中柱子的建筑结构中圆柱体柱堤高低位调节结构的应用方式作废

摘要

PROBLEM TO BE SOLVED: To easily construct a pile-column top end level adjustment structure in a building which uses piles as columns. ;SOLUTION: A loose hole 20 is bored in an anchor plate 18, and a stud bolt 19 is provided in an upright position in advance. After a pile-column 12 is erected, when the anchor plate 18 is positioned and placed on the upper surface of a pile cap 16 fitted over the top end of the pilecolumn 12, at least one of PC steel wire tensioning tapped holes 1 7 in the pile cap 16 is exposed to the depth of the loose hole 20, even if the position of the pile-column 12 is slightly off-center. Then a washer 21 is locked to the upper end of the loose hole 20, and when a bolt 22 is threaded from above via the washer 21 into the tapped hole 17 exposed to the depth of the loose hole 20, the anchor plate 18 is fixed in place and the stud bolt 19 is positioned indirectly.;COPYRIGHT: (C)1998,JPO
机译:解决的问题:在以桩为柱的建筑物中轻松构造桩柱顶端水平调整结构。 ;解决方案:在固定板18上钻了一个松散的孔20,并在直立位置预先设置了双头螺栓19。在竖立桩柱12之后,当将锚定板18放置并放置在装配在桩柱12的顶端上方的桩帽16的上表面上时,至少一根PC钢丝张紧攻丝孔1 7处于闭合状态。即使桩柱12的位置稍微偏离中心,桩帽16也暴露于松孔20的深度。然后,将垫圈21锁定到松孔20的上端,并且当螺栓22通过垫圈21从上方拧入暴露于松孔20的深度的螺纹孔17中时,固定板18被固定。到位,双头螺栓19间接定位。;版权所有:(C)1998,JPO

著录项

  • 公开/公告号JP3118207B2

    专利类型

  • 公开/公告日2000-12-18

    原文格式PDF

  • 申请/专利权人 株式会社熊谷組;

    申请/专利号JP19970131300

  • 发明设计人 実方 聰;

    申请日1997-05-21

  • 分类号E02D27/12;

  • 国家 JP

  • 入库时间 2022-08-22 01:29:30

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号