首页> 外国专利> SECURITY CONTROL METHOD FOR SHUNT PART OF TRAIN RUNNING TRACK, SECURITY CONTROL SYSTEM THEREFOR, AND TRAIN TRAFFIC SYSTEM

SECURITY CONTROL METHOD FOR SHUNT PART OF TRAIN RUNNING TRACK, SECURITY CONTROL SYSTEM THEREFOR, AND TRAIN TRAFFIC SYSTEM

机译:列车行驶轨迹避开部分的安全控制方法,其安全控制系统以及列车交通系统

摘要

PROBLEM TO BE SOLVED: To effectively avoid collision with a counter-traffic train even when the applicable train is in a reverse run.;SOLUTION: A control system 1 equipped with a security control system for a shunt part R2 on a train running track R applies to two trains TR of Formation 1 and Formation 2 running on the track R on its both sides to shunt with the shunt part R2 interposed. When one of the trains TR-1 and TR-2 has intruded to the shunt part R2 from any side, the control system 1 admits intrusion of the other trains 1/2 to the other part of the track R from the specified positions (antennae BC and AC) on the shunt part R2, and in the opposite case where the specified positions (antennae B1C and A1C) on the shunt part R2 are not attained within a certain time after the first train 1/2 has intruded completely, the system 1 rejects intrusion of the other train 2/1 to the other part of the track R from the specified positions (antennae BC and AC).;COPYRIGHT: (C)2002,JPO
机译:要解决的问题:即使适用的火车反向行驶,也要有效避免与反火车相撞。解决方案:控制系统1装有安全控制系统,用于火车行驶轨道R上的分流部件R2应用于在其轨道R的两侧上运行以在其间插入分流部分R2进行分流的两个编队1和编队2的列车TR。当列车TR-1和TR-2之一从任一侧侵入分路部分R2时,控制系统1允许另一列车1/2从指定位置(天线)侵入轨道R的另一部分。 BC和AC)在分流部分R2上,而在相反情况下,在第一列火车1/2完全侵入后的一定时间内未达到分流部分R2上的指定位置(天线B1C和A1C) 1拒绝另一列火车2/1从指定位置(天线BC和AC)侵入轨道R的另一部分。;版权:(C)2002,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号