首页> 外国专利> A method for the removal of, in the case of desulfurizing pig iron desulphurization slag forming solid

A method for the removal of, in the case of desulfurizing pig iron desulphurization slag forming solid

机译:一种用于脱硫的生铁脱硫渣形成固体的方法

摘要

The invention relates to a method for the removal of from pig iron - or steel melts forming slags, in particular desulphurization slag, in which the of the surface of a pig iron - or molten steel slag drawn off in a container is filled in and after filling with the slag by the object of a cooling medium is cooled and below a predetermined temperature finally, the container is tilted for the purpose of emptying. According to the invention, the filling in the clock of the deslagging, wherein the respective occl paint quantity of only one in the clock occl varnish point on the passing container is assigned and the amount of slag which is filled continuously along a predetermined distance, and finally cooled is thrown off. Dollars a in the case of a device for carrying out the process, with a the pig iron - or the molten steel bath containing a ladle, a cyclically moving slags scraper, a container for accommodating the slag, is the same time, a plurality of a container (3) is circular, which in the case of each stroke of the schlackenabkratzers a predetermined travel path of conveyance and, after the filling zone, a cooling zone (9) passing through, wherein after the ejection of the cooled slag the empty containers (3) are to the filling area zurückbefödert.
机译:本发明涉及一种从生铁或钢水中去除形成炉渣,特别是脱硫炉渣的方法,其中,将在容器中抽出的生铁或钢渣的表面填充到容器中和容器中之后。通过冷却介质的目的填充炉渣的材料被冷却并且最终低于预定温度,为了倒空目的而使容器倾斜。根据本发明,在排渣的时钟中进行填充,其中分配经过的容器上的时钟occl清漆点中的仅各自的occl涂料量,并且沿着预定距离连续填充的炉渣量;以及终于降温了。在用于执行该过程的装置的情况下,同时具有多个生铁或盛有钢水包的钢水浴,循环移动的炉渣刮刀,用于容纳炉渣的容器。容器(3)是圆形的,在Schlackenabkratzers的每个行程中,容器是预定的输送路径,并且在填充区域之后,冷却区域(9)经过,其中在排出冷却的炉渣之后,容器(3)到达灌装区域zurückbefödert。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号