首页> 外国专利> Hydraulic coal face lining system uses an initial pressure level at the ram, followed by a second and higher pressure level after a time delay, to increase the tunnel lining rate

Hydraulic coal face lining system uses an initial pressure level at the ram, followed by a second and higher pressure level after a time delay, to increase the tunnel lining rate

机译:液压煤工作面衬里系统使用闸板的初始压力水平,经过一段时间的延迟后使用第二个更高的压力水平,以提高隧道衬砌率

摘要

The hydraulic tunnel lining system in underground mining, e.g. coal mining, uses an initial operating hydraulic pressure on the hydraulic ram. When the first pressure level is achieved, a second and higher hydraulic pressure is applied after a time delay. The first pressure is 300 bar, and the second pressure is 400 bar. The two pressure levels are provided from separate sources, with a control block at the tool to change from one stage to the other.
机译:地下采矿中的液压隧道衬砌系统,例如煤矿开采时,在液压柱塞上使用初始工作液压。当达到第一压力水平时,在延时之后施加第二和更高的液压。第一压力是300巴,第二压力是400巴。这两个压力水平由不同的来源提供,工具上的控制块可从一个阶段切换到另一个阶段。

著录项

  • 公开/公告号DE10116916A1

    专利类型

  • 公开/公告日2002-10-17

    原文格式PDF

  • 申请/专利权人 RAG AG;

    申请/专利号DE2001116916

  • 发明设计人 WLOKA HORST;

    申请日2001-04-05

  • 分类号E21D23/26;

  • 国家 DE

  • 入库时间 2022-08-22 00:27:01

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号