首页>
外国专利>
RESOURCE ASSIGNMENT CONTROLLER, RESOURCE ASSIGNMENT CONTROL METHOD, AND RESOURCE ASSIGNMENT CONTROL SYSTEM
RESOURCE ASSIGNMENT CONTROLLER, RESOURCE ASSIGNMENT CONTROL METHOD, AND RESOURCE ASSIGNMENT CONTROL SYSTEM
展开▼
机译:资源分配控制器,资源分配控制方法和资源分配控制系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a resource assignment controller for efficiently using a resource.;SOLUTION: A wireless controller 1 of this invention is connected to a mobile phone capable of being communicated by the TDD system and the FDD system. A communication system control section 15 acquires a resource use rate of the TDD and a resource use rate of the FDD from a resource use rate storage section 17. The communication system control section 15 decides which communication system of the TDD resource and the FDD resource is to be selected for a call from the mobile phone on the basis of the TDD resource use rate and the FDD resource use rate. A TDD resource assignment management section 11 or an FDD resource assignment management section 13 instructs the base station to assign the resource of the communication system.;COPYRIGHT: (C)2003,JPO
展开▼