In order to provide an operation and maintenance planning aiding system for a power generation installation which prepares an operation plan for a plurality of power generation units by making use of actual plant data and based on a total judgement including a variety of circumstances of the machine and apparatus or the parts thereof in the power generation units, in the system the plurality of power generation units 41, 42, 51 and 52, a power supply command center 3 and a service center 1 are arranged and connected via a communication network 6, the service center 1 obtains the plant data via the communication network 6 from the plurality of power generation units 41, 42, 51 and 52, calculates in real time a power generation efficiency of a concerned power generation unit for every plurality of power generation units 41, 42 51 and 52 by making use of the obtained plant data and design data of the concerned power generation unit and prepares an operation and maintenance plan for each of the power generation units based on the calculated power generation efficiency.
机译:为了提供一种用于发电设备的运行和维护计划辅助系统,该系统通过利用实际工厂数据并基于包括机器的各种情况和故障的总判断来为多个发电单元准备运行计划。发电单元中的设备或其部件,在系统中,多个发电单元 41、42、51 52,供电指令中心 3 和服务中心 1 通过通信网络 6进行布置和连接,服务中心 1 通过以下方式获取工厂数据多个发电单元 41、42、51 52的通信网络 6 实时计算a的发电效率通过使用所获得的相关电厂的工厂数据和设计数据,每 41、42 51 52 个发电单元中的每个相关发电单元发电单元,并基于计算出的发电效率为每个发电单元准备运行和维护计划。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号