首页> 外国专利> A method to remove steel post inducing local buckling after completion of bridge erection to use it

A method to remove steel post inducing local buckling after completion of bridge erection to use it

机译:桥梁安装完成后消除引起局部屈曲的钢柱的方法

摘要

PURPOSE: A removal method for a steel post using buckling is provided to remove a steel post safely and easily by decreasing working load added on a steel post and a screw jack. CONSTITUTION: After completing a temporary work for a structure by installing a steel post and a screw jack, the removal method for a steel post using buckling comprises the steps of: forming cut ends by cutting a portion of steel posts(2) supporting a structure(3); if the load added on the steel posts(2) is decreased by partial buckling, removing the steel posts(2) by rotating a screw(4a) of a screw jack(4).
机译:目的:提供一种使用屈曲的钢柱拆除方法,以通过减少加在钢柱和螺旋千斤顶上的工作负荷来安全,轻松地拆除钢柱。组成:在通过安装钢柱和螺旋千斤顶完成结构的临时工作之后,使用屈曲去除钢柱的方法包括以下步骤:通过切割一部分支撑结构的钢柱来形成切口端(2) (3);如果通过部分屈曲减小了钢柱(2)上施加的载荷,请通过旋转千斤顶(4)的螺钉(4a)卸下钢柱(2)。

著录项

  • 公开/公告号KR100402546B1

    专利类型

  • 公开/公告日2003-10-17

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20010028950

  • 发明设计人 육일동;

    申请日2001-05-25

  • 分类号E04C3/30;

  • 国家 KR

  • 入库时间 2022-08-21 23:45:02

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号