首页> 外国专利> Waterway banking starts from sheetpiling to planned depth then anchor piles rammed in over sheetpiling top into ground on land side topped by spar flanges and clamps.

Waterway banking starts from sheetpiling to planned depth then anchor piles rammed in over sheetpiling top into ground on land side topped by spar flanges and clamps.

机译:水路堤岸从板桩开始到计划的深度,然后在板桩顶部夯入的锚固桩进入陆面的地面,并由梁翼缘和夹具顶住。

摘要

Sheet piles (3) are run down to planned depth and ready prepared anchor piles (5) run in via the top sheet pile edge on the water side into the earth on the land side. Prepared spar flanges are placed on the sheet pile wall top edge (4) and each flange has its own clamp operably joined to the anchor pile in the non-supporting flange part. Before installing, the sheetpiles should be fitted with knob projections on the water side and thereafter rammed in. Each anchor is a lengthed steel profile, specifically double tee with flanges. The centrally broached top plate with welded web is holed to register with nut or top plate hole.
机译:板桩(3)下降到计划的深度,准备好的锚固桩(5)从水侧的顶板桩边缘进入地面。将准备好的翼梁法兰放在板桩墙的顶部边缘(4)上,每个法兰都有其自己的夹具,该夹具可操作地连接到非支撑法兰部分中的锚桩。在安装之前,薄板桩应在水侧安装旋钮突起,然后夯入。每个锚都是加长的钢型材,特别是带法兰的三通。中心拉孔的带有焊接腹板的顶板开孔以与螺母或顶板孔对齐。

著录项

  • 公开/公告号DE10143624A1

    专利类型

  • 公开/公告日2003-03-27

    原文格式PDF

  • 申请/专利权人 TIEFBAU GMBH UNTERWESER;

    申请/专利号DE2001143624

  • 发明设计人 DIEKMANN JENS;

    申请日2001-09-06

  • 分类号E02D5/16;E02D5/76;

  • 国家 DE

  • 入库时间 2022-08-21 23:42:42

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号