首页> 外国专利> In excavation

In excavation

机译:在发掘中

摘要

PROBLEM TO BE SOLVED: To reduce the wear by at least holding the earth on an inner surface of a chute to guide the excavated stuff to the downstream side. ;SOLUTION: A wire net 7 is arranged on an inner surface of a bottom wall part 6 of a chute 4. The wire net 7 is inserted into a plurality of support pieces 8 projected from the bottom wall 6 from an upper part in an attachable/ detachable manner, and slightly raised above the inner surface of the bottom wall part 6. The excavated stuff 9 such as earth and sand to be kept on the inner surface of the bottom wall part 6 is evenly kept making use of the mesh of the wire net 7. When the excavated stuff 10 produced during the excavation is charged into the chute 4, and carried out on the downstream side, the excavated stuff 10 slides down over the excavated stuff 9. A plurality of baffle plates are provided on the inner surface of the bottom wall part 6 in a crossing manner in place of the wire net, or a plurality of baffle plates are alternately projected from each side wall part 5 of the chute with the prescribed intervals in the discharging direction. The wear of the inner surface of the chute bottom wall part can be easily reduced thereby.;COPYRIGHT: (C)1998,JPO
机译:要解决的问题:通过至少将泥土保持在溜槽的内表面上,以将挖掘的物料引导到下游侧,以减少磨损。 ;解决方案:将金属丝网7布置在滑槽4的底壁部分6的内表面上。将金属丝网7以可连接的方式插入从底壁6的上部突出的多个支撑件8中。以可拆卸的方式,并且在底壁部分6的内表面上方略微升高。要保留在底壁部分6的内表面上的诸如泥土和沙土的挖掘出的物料9利用网格的网格均匀地保持。钢丝网7。将在挖掘过程中产生的挖掘物10装入斜槽4中并在下游侧运出时,挖掘物10在挖掘物9上向下滑动。在内部形成多个挡板。底壁部分6的表面以交错的方式代替金属丝网,或者多个斜板从斜槽的每个侧壁部分5以预定的间隔沿排出方向交替地突出。可以很容易地减少斜槽底壁部分内表面的磨损。;版权所有:(C)1998,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号