首页> 外国专利> Process and plant for the manufacture of hot rolled biphasic steels

Process and plant for the manufacture of hot rolled biphasic steels

机译:热轧双相钢的生产工艺和设备

摘要

"PROCESS AND INSTALLATION FOR THE MANUFACTURE OF HOT-LAMINATED STATE BIPHASIC STEELS". In order not to depend on the manufacture of biphasic steels (2), which are fabricated after the last deformation step in a final cooling mill (1) by determined cooling, wherein a biphasic structure of 70 to 90% ferrite and 30 is adjusted. At 10% martensite, steel geometry and strip speed, it is recommended according to the invention to cool down a cooling segment (6) with water cooling steps (7) arranged successively in the form of a light cooling.
机译:“热层压状态双相钢的制造过程和安装”。为了不依赖于双相钢(2)的制造,所述双相钢(2)在最终的冷却轧机(1)中通过确定的冷却在最后的变形步骤之后制造,其中调节了70-90%的铁素体和30的双相结构。根据本发明,在马氏体,钢的几何形状和带钢速度为10%的情况下,建议使用以水冷步骤(7)顺序排列的轻冷却方式冷却冷却段(6)。

著录项

  • 公开/公告号BR9912310A

    专利类型

  • 公开/公告日2004-08-31

    原文格式PDF

  • 申请/专利权人 SMS DEMAG AG;

    申请/专利号BR19999912310

  • 发明设计人 AUGUST SPROCK;

    申请日1999-07-17

  • 分类号C21D8/02;C21D1/02;

  • 国家 BR

  • 入库时间 2022-08-21 23:11:49

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号