PURPOSE: A construction method for landscape architectural facilities of the open-cut ground using quarry is provided to protect the open-cut ground. CONSTITUTION: The construction method for landscape architectural facilities of the open-cut ground using quarry comprises the steps of: forming an open-cut area having the appointed gradient against the bottom(102); excavating the open-cut area(100) and the bottom(102) concavely by leaving a minimum banking space, then placing concrete and erecting quarry(200) on the concrete; installing lower stone(220) by forming a fixing hole on the backside of the quarry(200), then interposing CEMM anchor, installing a wire member(205) on the CEMM anchor to make the lower part of the quarry(200) buried under the concrete, installing the wire member(205) of the quarry(200) on an anchor ring(205') fixed on the open-cut area(100); fixing the lower stone(220) by filling up a banking space formed between the open-cut area(100) and the lower stone(220) with soil(250); installing upper stone(230) by installing a CEMM anchor on the backside of quarry(200), locating the lower end of the quarry(200) on the soil filled in the backside of the lower stone(220), and fixing the wire member(205) fixed on the quarry(200) to the wire ring(205') of the open-cut area(200); fixing the upper stone by filling up a banking space formed between the open-cut area(100) and the upper stone(230) with soil(250); and installing and fixing upper stone repeatedly to the appointed height.
展开▼