首页> 外国专利> The advanced method for arrangement of prefabricated reinforcement for each span for Movable Scaffolding System in the double-T girder bridge

The advanced method for arrangement of prefabricated reinforcement for each span for Movable Scaffolding System in the double-T girder bridge

机译:双T梁桥活动脚手架系统每个跨度预制钢筋布置的先进方法。

摘要

The present invention is a double-T bridge a mobile scaffolding method; it is directed to a method of installing a unit span of the bridge assembled (Prefabrication) line as a reinforced construction by (MSS Scaffolding Movable System).; The present invention includes the steps of assembling the reinforcement and sheet-seugwan in a span unit by installing a reinforced sheet produced on the bridge top and pouring group; Step up to carry non-pedigree, which are then installed to span concrete and; By using a hoist for handling it reinforced has been installed on the mobile device itself bigyegong (Hoist) after lifting, characterized by using only mechanical devices without the use of heavy equipment as a step in the installation movement,.; It is possible to shorten the tea reinforced sheet assembly and installation of the bridge, and workability improves seugwan air-construction method according to the invention by providing a double line to assemble the reinforcement and sheet-seugwan to span unit.
机译:本发明是一种双T桥移动脚手架的方法;本发明涉及一种通过(MSS脚手架移动系统)安装作为加固构造的桥梁组装(预制)生产线的单元跨度的方法。本发明包括通过在桥顶部和浇注组上安装生产的增强板,在跨度单元中组装增强和板桩的步骤。加强携带非血统书,然后将其安装以跨越混凝土;以及通过使用提升机来处理它,在提升之后,已经在移动设备本身上安装了加固设备bigyegong(提升机),其特征在于仅使用机械设备而无需使用重型设备作为安装运动的一个步骤。可以缩短茶增强板的组装和桥的安装,并且通过提供双线以将增强件和板-西向湾组装成跨度单元,可加工性改善了根据本发明的西关空气建造方法。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号