首页>
外国专利>
METHOD roll control and sediment high-rise buildings
METHOD roll control and sediment high-rise buildings
展开▼
机译:方法防滚和沉积高层建筑
展开▼
页面导航
摘要
著录项
相似文献
摘要
method u0443u043fu0440u0430u0432u043bu0435u043du0438u00a0 u043au0440u0435u043du043eu043c and draught of massive high-rise u0441u043eu043eu0440u0443u0436u0435u043du0438u00a0 and his foundation, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 geodetic u043du0438u0432u0435u043bu0438u0440u043eu0432u043au0443 u0441u043eu043eu0440u0443u0436u0435u043du0438u00a0, lips u043du0430u0432u043bu0438u0432u0430u044eu0442 angle and orientation of list u0441u043eu043eu0440u0443u0436u0435u043du0438u00a0 equal u043au0440u0435u043du0443 foundation, u043eu043fu0440u0435u0434u0435u043bu00a0u044eu0442 excessive amount of the soil under the foundation by its lowest rainfall, u043fu0440u0435u043fu00a0u0442 an appropriate address list.appoint the diameter and number of wells u0434u043bu00a0 u043fu043eu0433u043bu043eu0449u0435u043du0438u00a0 soil with the lowest precipitation and the length of each of the wells u043eu043fu0440u0435u0434u0435u043bu00a0u044eu0442 formula;where v is the volume of the soil under the foundation u043fu043eu0433u043bu043eu0449u0430u0435u043cu044bu0439;;n is the number of wells u0433u0440u0443u043du0441u0442u0430;;what is the area of u0441u0435u0447u0435u043du0438u00a0 wells;;l is the length of a borehole from the foundation to u0441u043eu0435u0434u0438u043du0435u043du0438u00a0 her with a hole on the other side of the foundation;put on the foundation in the characteristic points of the target with the coordinate grid and u043du0430u043fu0440u0430u0432u043bu00a0u044eu0442 on each of the targets in the coordinates of the beam from the laser u043du0438u0432u0435u043bu0438u0440u0430 or la u0437u0435u0440u043du043eu0433u043e target mount sill plates and buttresses with databases and u043eu0433u043eu043bu043eu0432u043au0430u043cu0438, u0448u0430u0440u043du0438u0440u043du043e u0441u043eu0435u0434u0438u043du00a0u044eu0442 u043eu0433u043eu043bu043eu0432u043au0438 u043au043eu043du0442u0440u0444u043eu0440u0441u043eu0432 with pipe and fixed on the base u043au043eu043du0442u0440u0444u043eu0440u0441u043eu0432 races even the value of u043eu043fu043eu0440u043du044bu043cu0438 plates.u0431u0443u0440u00a0u0442 under the ground on the center u0442u00a0u0436u0435u0441u0442u0438 u043fu043eu0433u043bu043eu0449u0430u0435u043cu043eu0433u043e soil slope wells, to u0441u043eu0435u0434u0438u043du0435u043du0438u00a0 them with each other, u0437u0430u043fu043eu043bu043du00a0u044eu0442 wells clayey u043fu0443u043bu044cu043fu043eu0439 put every like from the wells under the center u0442u00a0u0436u0435u0441u0442u0438 u043fu043eu0433u043bu043eu0449u0430u0435u043cu043eu0433u043e soil depth vibrator include immersion vibrators, u043fu0435u0440u0435u0434u0430u0432u0430u00a0 pulsating u043au043eu043bu0435u0431u0430u043du0438u00a0 clayey pulp and u043fu0440u0438u043bu0435 u0433u0430u044eu0449u0438u043c zonesincrease the draught of u0433u0440u0443u043du0442u043eu0432u043eu0433u043e u043eu0441u043du043eu0432u0430u043du0438u00a0 under the action of the masses u0441u043eu043eu0440u0443u0436u0435u043du0438u00a0, absorbing wells, filled with clay u043fu0443u043bu044cu043fu043eu0439, excessive soil under the foundation and u0441u043fu043eu043bu044cu0437u0443u044eu0442 mass u0441u043eu043eu0440u0443u0436u0435u043du0438u00a0 and gradually u0443u0441u0442u0440u0430u043du00a0u044eu0442 his nose while controlling the hub height u0441u043eu043eu0440u0443u0436u0435u043du0438u00a0 on u0437u0430u0439u0447u0438u043au0430u043c of laser rays, dc motors u0435u0449u0430u044eu0449u0438u043cu0441u00a0 at grid reference target, adjust the list.u0432u043au043bu044eu0447u0430u00a0 either a vibrator, continue to absorb soil boreholes, fully u0443u0441u0442u0440u0430u043du00a0u044eu0442 bias to estimated values of the u0437u0430u043au0440u044bu0442u0438u00a0 u0441u043eu043eu0440u0443u0436u0435u043du0438u00a0 high-rise u0430u0437u043eu0440u0430 and support bases u043au043eu043du0442u0440u0444u043eu0440u0441u043eu0432 in sill plate, remove the immersion vibrators, u0437u0430u043fu043eu043bu043du00a0u044eu0442 not completed sections of wells a u043fu0443u043bu044cu043fu043eu0439 and exploit host s.
展开▼