首页> 外国专利> METHOD FOR DETERMINING and reliability of slopes

METHOD FOR DETERMINING and reliability of slopes

机译:边坡确定与可靠度的方法

摘要

1.method u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 and reliability of u043fu043eu0432u044bu0448u0435u043du0438u00a0, including engineering geological survey of repose, the benchmark system u0434u043bu00a0 u043du0430u0431u043bu044eu0434u0435u043du0438u00a0u043cu0438 for defoe u0440u043cu0430u0446u0438u00a0u043cu0438 repose, repose in the process and the strengthening of its exploitation and u0432u043eu0437u0432u0435u0434u0435u043du0438u00a0 by u0430u0440u043cu0438u0440u043eu0432u0430u043du0438u00a0 u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 soil, so that, with a view to u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability and u0443u043cu0435u043du044cu0448u0435u043du0438u00a0 labour intensive workson the u043eu0442u043au043eu0441u0430u0445 with angle to the horizon 1 engineering geological survey of repose and the u043fu043eu043bu043eu0436u0435u043du0438u00a0 surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 repose depth u043fu0440u043eu0438u0437u0432u043eu0434u00a0 t by u0437u043eu043du0434u0438u0440u043eu0432u0430u043du0438u00a0 soil repose using a manual probe, such as a probe u0440u0437u0433 - "russian probe.by u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 from u0437u043eu043du0434u0438u0440u043eu0432u0430u043du0438u00a0 minimum values Pmin resistance soil sensing in each well u0437u043eu043du0434u0438u0440u043eu0432u0430u043du0438u00a0 located u043fu0440u0438u043cu0435u0440u043d in the range of u043fu0435u0440u043fu0435u043du0434u0438u043au0443u043bu00a0u0440u043du043eu043cu0443 wing repose and the sole, and the volatility of u043fu043eu043bu043eu0436u0435u043du0438u00a0 values Pmin depth u0434u043bu00a0 the surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 u043eu043fu0440u0435u0434u0435u043bu00a0u044eu0442 formula;where hmax and hmin respectively maximum and minimum value of the u043fu043eu043bu043eu0436u0435u043du0438u00a0 Pmin in range u0434u043bu00a0 repose the surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 repose, however, if cutting u0443u043bu044cu0442u0430u0442u0430u043c u0437u043eu043du0434u0438u0440u043eu0432u0430u043du0438u00a0 soil repose u043fu0440u0438u043du00a0u0442u043e decided on the necessity of watching him u0434u0435u0444u043eu0440u043cu0430u0446u0438u00a0u043cu0438, a u0440u0435u043fu0435u0440u043du0443u044e system of u0437u0430u0431u0438u0432u043du044bu0445 elements u043du0430u043fu0440u0438u043c ep reinforcing rods, u0441u043eu0441u0442u043eu00a0u0449u0443u044e of u0440u0435u043fu0435u0440u043eu0432 and marksin this u0437u0430u0431u0438u0432u043du044bu0435 u0440u0435u043fu0435u0440u043eu0432 elements located on the u043eu0442u043au043eu0441u0435 on depth h, u043eu043fu0440u0435u0434u0435u043bu00a0u0435u043cu0443u044e formula;where hu043f - depth u043fu043eu043bu043eu0436u0435u043du0438u00a0 surface soil u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 repose in place driving element of reference frame, below which the soil can be considered stationary, with u0437u0430u0431u0438u0432u043du044bu0435 al u0435u043cu0435u043du0442u044b marks have the u043eu0442u043au043eu0441u0435 and when there are several surfaces u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 depth h2 of these elements in the soil u043eu043fu0440u0435u0434u0435u043bu00a0u0435u0442u0441u00a0 u0434u043bu00a0 closest to repose the surface of the surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 repose formula;where is the nearest to the surface of hu043f1 u0440u0430u0441u043fu043eu043bu043eu0436u0435u043du0438u00a0 repose surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 place driving element of brand, and u0434u043bu00a0 deeper surfaces u0441u043au043eu043bu044cu0436u0435 u043du0438u00a0 driving element in soil in place of repose depth h2, the depth of u043eu043fu0440u0435u0434u0435u043bu00a0u0435u0442u0441u00a0 formula;where hu043fi - depth u043fu043eu043bu043eu0436u0435u043du0438u00a0 previous smaller surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 soil repose; hu043fi + 1 is the next deeper surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 u043fu043eu043bu043eu0436u0435u043du0438u00a0 soil repose in place driving element stamps, with u0440u0430u0441u0441u0442u043eu00a0u043du0438u0435 1 between u0437u0430u0431u0438u0432u043du044bu043cu0438 elements u0440u0435u043fu0435u0440u043eu0432 and marks u043eu043fu0440u0435u0434u0435u043bu00a0u0435u0442u0441u00a0 formula;where d is the diameter or the size of a u0441u0435u0447u0435u043du0438u00a0 related, facing each other by these parties, and the diameters u0437u0430u0431u0438u0432u043du044bu0445 elements with ra u0441u0442u043eu00a0u043du0438u0435 between u0440u0435u043fu0435u0440u0430u043cu0438 and brands u0438u0437u043cu0435u0440u00a0u044eu0442 roulette, for example, a laser, and, if the engineering geological research and the ground sensing u0442u0430u0442u0430u043c observation u0434u0435u0444u043eu0440u043cu0430u0446u0438u00a0u043cu0438 repose decide to strengthen it.there are elements in the soil repose depth h3, u043eu043fu0440u0435u0434u0435u043bu00a0u0435u043cu0443u044e formula;where hu043f - depth u043fu043eu043bu043eu0436u0435u043du0438u00a0 surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 repose in the place of these elements below which the repose is stationary, the u0437u0430u0431u0438u0432u043du044bu0435 element you have to u043eu0442u043au043eu0441u0435 free scheme, u043eu043fu0440u0435u0434u0435u043bu00a0u0435u043cu043eu0439 calculation and u0443u0441u043bu043eu0432u0438u00a0u043cu0438 u043fu0440u043eu0435u043au0442u0438u0440u043eu0432u0430u043du0438u00a0, for example, in chess u043fu043eu0440u00a0u0434u043au0435 and before an u0437u0430u0431u0438u0432u043au043eu0439 element u043bu0430u0434u044bu0432u0430u044eu0442 on the ground and by the end of thewhich will lower the u0437u0430u0431u0438u0432u043au0435 element in soil, it's hard u0437u0430u043au0440u0435u043fu043bu00a0u044eu0442 the, and at the other end, the upper and u0437u0430u0431u0438u0432u043au0435 element into the soil, the wear ring hammer at u044bu043fu043eu043bu043du0435u043du043du044bu0439 u0446u0435u043bu0438u043au043eu0432u044bu043c with possibility of free u043fu0435u0440u0435u043cu0435u0449u0435u043du0438u00a0 on u0437u0430u0431u0438u0432u043du043eu0433u043e element on the lateral surface of the ring hammer are pa u0440u0430u043bu043bu0435u043bu044cu043du043e its longitudinal axis of symmetry (p - metaphorically penfor example, four and u0438u043cu0435u0435u0442u0441u00a0 one or more cutting radial u043eu0442u0432u0435u0440u0441u0442u0438u00a0 threaded u0434u043bu00a0 locking bolts, then working for the pens p - creative form u043fu043eu0434u043du0438u043cu0430 by the hammer with the located inside u0437u0430u0431u0438u0432u043du044bu043c element in vertical or oblique position above the point of driving.after working for the pens p - creative form to raise the hammer on the u0437u0430u0431u0438u0432u043du043eu0433u043e element up and then u043fu0440u0438u0434u0430u0432u0430u00a0 hand accelerating further e to the acceleration of free u043fu0430u0434u0435u043du0438u00a0 pushes him down, u0443u0434u0430u0440u00a0u00a0 on u0431u043eu0439u043au0443, after which the hammer again stir up and force u0443u0434u0430u0440u00a0u044eu0442 on u0431u043eu0439u043au0443 and so on.to u043fu043eu0433u0440u0443u0436u0435u043du0438u00a0 u0437u0430u0431u0438u0432u043du043eu0433u043e element at the depth at which the u043eu043au0430u0436u0435u0442u0441u00a0 near the ground surface, after which the ring hammer raise at a height on the tooth u0438u0432u043du043eu043cu0443 element and u0437u0430u043au0440u0435u043fu043bu00a0u044eu0442 at this altitude shut-off bolt, then the u043eu0442u043au0440u0435u043fu043bu00a0u044eu0442 and move it up the u0437u0430u0431u0438u0432u043du043eu043cu0443 element at the right height and u0437u0430u043au0440u0435u043fu043bu00a0u044eu0442 fight at this altitude.a locking bolt u043eu0442u043au0440u0435u043fu043bu00a0u044eu0442 and oppose to the u0437u0430u0431u0438u0432u043au0435 element with circular hammer at greater depth and so on.prior to immersion u0437u0430u0431u0438u0432u043du043eu0433u043e element in soil to the required depth, the u043eu0442u043au043eu0441u0430u0445 with angle to the horizon 10 soil repose before u0437u0430u0431u0438u0432u043au043eu0439 element u0443u0441u0442u0430u043du0430u0432u043b u0438u0432u0430u044eu0442 platform, creative form with a horizontal and u0434u043bu00a0 working, with a vertical element of the platform is in the direction of u0431u0440u043eu0432 images kee repose,a long - to the soles and after installation on the slope vertical elements in soil u0432u0434u0430u0432u043bu0438u0432u0430u044eu0442 repose.;2. method u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability of on p.1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, u0434u043bu00a0 u0437u0430u0431u0438u0432u043du043eu0433u043e u0441u0442u0435u0440u0436u043du00a0 protection from corrosion and u043fu043eu0432u044bu0448u0435u043du0438u00a0 his load in the horizontal and vertical loads u0437u0430u0431u0438u0432u043du043eu0439 element m maybe be implemented with u0443u0448u0438u0440u0435u043du0438u0435u043c lower, u0437u0430u0431u0438u0432u0430u0435u043cu043eu043c in substrate, the end, and u043eu0431u0440u0430u0437u043eu0432u0430u0432u0448u0438u0439u0441u00a0 in u0437u0430u0431u0438u0432u043au0435 in the clearance between the side surface of the u0437u0430u0431u0438u0432u043du043eu0433u043e element and ground in the u0442u0432u0435u0440u0434u0435u044eu0449u0438u043c in time withfor example, the cement in the process of driving element or after it.;3. method u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 and u043fu043eu0432u044bu0448u0435u043du0438u00a0 on reliability of 1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 what mr. metaphorically platform may be implemented u0441u0432u0430u0440u043du044bu043cu0438 and u0440u0435u0448u0435u0442u0447u0430u0442u044bu043cu0438 of reinforcement 100 lee.;4. method u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 and u043fu043eu0432u044bu0448u0435u043du0438u00a0 on reliability of u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the u0442u043eu0440u0446u0430u0445 circular hammer can be implemented u043eu0442u0432u0435u0440u0441u0442u0438u00a0 (u0443u0433u043bu0443u0431u043bu0435u043du0438u00a0) u0434u043bu00a0 u043fu043eu0434u043fu043eu0440u043e to u0434u043bu00a0 insurance its fixation at a given height, the working u0434u043bu00a0 insurance may retain the hammer as a bolt on the high shut-off the u0437u0430u0431u0438u0432u043du043eu0433u043e element.;5. method u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability of on p.1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, circular axial hole hammer and u043eu0442u0432u0435u0440u0441u0442u0438u00a0 by u0434u0432u0443u043cu00a0 symmetrically located rigid plates with the firing pin, the joint bolt ami, through cross cutting u043eu0442u0432u0435u0440u0441u0442u0438u00a0 them with bolts at the end may be in the form of a u0441u0435u0447u0435u043du0438u00a0 close to form a u0441u0435u0447u0435u043du0438u00a0, u0437u0430u0431u0438u0432u0430u0435u043cu043eu0433u043e in soil elementwhat on the outer surface of one of the rigid symmetrical plates firing pin u043eu0442u0432u0435u0440u0441u0442u0438u00a0 u0434u043bu00a0 bolts can be implemented with the deepening of u0434u043bu00a0 head bolt close to no m in size and shape.;6. method u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 and u043fu043eu0432u044bu0448u0435u043du0438u00a0 on reliability of u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the axial hole ring hammer can be implemented with different transversal se u0447u0435u043du0438u00a0 height, with the u0440u0430u0441u0441u0442u043eu00a0u043du0438u0438 u from the log gets rid of the hammer, it has a bigger diameter than in the middle part, and the value of u can be defined by the formula;where h is the height of ring hammer.;7. method u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability of on p.1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, after u0437u043eu043du0434u0438u0440u043eu0432u0430u043du0438u00a0 soil repose and u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 u043fu043eu043bu043eu0436u0435u043du0438u00a0 surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 repose depth can be performed drilling wells on the u043eu0442u043au043eu0441u0435 with targeted sampling of soil u043du0435u043du0430u0440u0443u0448u0435u043du043du043eu0439 structures in the array and in the level of the surface of u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 repose, followed by the definition of the mechanical the soil properties in the laboratory.;8. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on p.1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 that, in the u0432u0434u0430u0432u043bu0438u0432u0430u043du0438u0438 needle probe into the soil through the hole in the support u043fu00a0u0442u0435 on the supporting u043fu00a0u0442u0443 may be accompanied by a vertically downward force q, e.g. imer, in the form of a weight of a person or to a u0430u043du043au0435u0440u043eu0432u043au043eu0439 u043fu00a0u0442u044b soil in u0430u043du043au0435u0440u0430u043cu0438, for example, in the form of a hammered into the soil through the u043eu0442u0432u0435u0440u0441u0442u0438u00a0 in a u043fu00a0u0442u0435,u0441u0442u0435u0440u0436u043du00a0u043cu0438 with u0448u043bu00a0u043fu043au0430u043cu0438 and keep soil from the surface to a depth of u0432u044bu043fu043eu0440u0430 u043fu043eu0433u0440u0443u0436u0435u043du0438u00a0 an probe into the soil, the strength q can be defined lena's formula;where n is the maximum value of the force u0432u044bu043fu043eu0440u0430 soil on the surface by dipping an probe into the soil, and the diameter d1 u043eu0442u0432u0435u0440u0441u0442u0438u00a0 inside a u043fu00a0u0442u044b u0434u043bu00a0 nak u043eu043du0435u0447u043du0438u043au0430 probe can be defined by the formula;where d is the diameter or the size of the diagonal u043eu0441u043du043eu0432u0430u043du0438u00a0 u043au043eu043du0438u0447u0435u0441u043au043eu0433u043e or u043fu0438u0440u0430u043cu0438u0434u0430u043bu044cu043du043eu0433u043e needle probe, and u043eu043fu043eu0440u043du0430u00a0 u043fu00a0u0442u0430 may take the form of circle, u043fu0440u00a0u043cu043eu0443u0433u043eu043bu044cu043du0438u043au0430 and so on, and the minimum u0440u0430u0441u0441u0442u043eu00a0u043du0438u0435 m from the axis in a u043eu0442u0432u0435u0440u0441u0442u0438u00a0 u043fu00a0u0442u0435 to external u043au0440u0430u00a0 a u043fu00a0u0442u044b can be defined by the formula;m / D1,05.;9. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the length of m u043eu0431u044au0435u0434u0438u043du00a0u044eu0449u0435u0439 struts coupling probe may exceed the joint length of n threads two joint rods of the probe and u043eu043fu0440u0435u0434u0435u043bu00a0u0435u043cu044bu0445 formula;10. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on p.1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, u0441u043fu0435u0446u043cu0443u0444u0442u0430, u043eu0431u044au0435u0434u0438u043du00a0u044eu0449u0430u00a0 struts probe point of impact hammer can be accomplished with the centre u043eu0442u0432u0435u0440u0441u0442u0438u00a0u043cu0438 (u0443u0433u043bu0443u0431u043bu0435u043du0438u00a0u043cu0438) on its end faces under the struts zo yeah, and a transverse partition in the middle, and it can be implemented in the form of two u0443u0441u0435u0447u0435u043du043du044bu0445 cones, united between upper lower u043eu0441u043du043eu0432u0430u043du0438u00a0u043cu0438, and the more the u00a0u0432u043bu00a0u0435u0442u0441u00a0 u0442u043eu0440u0446u0430u043cu0438 u0441u043fu0435u0446u043cu0443u0444u0442u044b.;11. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on p.1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, on the lateral surface of the u0441u043fu0435u0446u043cu0443u0444u0442u044b can be fastened, for example, a groove rod, a joint u0445u043eu043cu0443u0442u043eu043c parallel rod with derivative full parallel u043fu0435u0440u0435u043cu0435u0449u0435u043du0438u00a0, while at the end of the parallel u0441u0442u0435u0440u0436u043du00a0 installed, for example, a groove type reflector u0434u043bu00a0 laser roulette, with u043fu0430u0440u0430u043bu043b u0435u043bu044cu043du044bu0439 rod can be fixed the engine bolt.installed on the groove in the nozzle ring.;12. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that u043bu0430u0437u0435u0440u043du0430u00a0 roulette can be strengthened, for example, in the carving on the web by the vertically near the probe, and u043bu0430u0437u0435u0440u043du0430u00a0 roulette u0440u0430u0441u043fu043eu043bu0430u0433u0430u0435u0442u0441u00a0 above brand - u043eu0442u0440u0430u0436u0430u0442u0435u043bu00a0 on u0440u0430u0441u0441u0442u043eu00a0u043du0438u0438, regulated by the technical data of laser roulette and u0441u043bu043eu0432u0438u00a0u043cu0438 production works.;13. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the lateral surface of the connectors, u043eu0431u044au0435u0434u0438u043du00a0u044eu0449u0438u0445 struts may be vertical u0440u0435u0431u0440 probe as well.;14. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the faceplate openings may be located u0441u043fu0435u0446u043cu0443u0444u0442u044b elastic gaskets, such as measures u0434u0435u0440u0435u0432u00a0u043du043du044bu0435.;15. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that a reference frame of the u0437u0430u0431u0438u0432u043du044bu0445 elements on the railway embankment can be arranged at the bro. u0432u043au0438 repose, and the rapper in the u043cu0435u0436u0434u0443u043fu0443u0442u044cu0435.;16. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on p.1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, however, that during the construction of embankment u0440u0430u0437u0440u044bu0445u043bu0435u043du043du0430u00a0 zone on the surface of the u043fu0440u0438u043bu0435u0433u0430u044eu0449u0430u00a0 repose, u043eu0431u0440u0430u0437u043eu0432u0430u0432u0448u0430u00a0u0441u00a0 for technological reasons, as well as the area of u0442u0438u00a0 u0432u0435u0440u043eu00a0u0442u043du043eu0439 surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 repose, which may be the cause of the deformation in the process of exploitation, can be blocked u0430u0440u043cu0438u0440u0443u044eu0449u0438u043c material nap remer u0430u0440u043cu0430u0442u0443u0440u043du044bu043cu0438 netsthe width of the zone u043fu0435u0440u0435u043au0440u044bu0442u0438u00a0 s can be defined by the formula;where l is the width of the zone of u043du0435u0443u043fu043bu043eu0442u043du0435u043du043du043eu0433u043e soil repose, u043fu0440u0438u043bu0435u0433u0430u044eu0449u0430u00a0 to its surface or from the surface of u0440u0430u0441u0441u0442u043eu00a0u043du0438u0435 repose to the potential surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0, preach eat reinforcement soil repose u0432u044bu043fu043eu043bu043du00a0u044eu0442 u043fu043eu0441u043bu043eu0439u043du043e as his u0432u043eu0437u0432u0435u0434u0435u043du0438u00a0.;17. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the platform, creative forms can be executed by a lattice of reinforcing steel.;18. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on p.1, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, u0440u0430u0441u0441u0442u043eu00a0u043du0438u0435 between u0437u0430u0431u0438u0432u043du044bu043cu0438 elements u0443u043au0440u0435u043fu043bu00a0u044eu0449u0438u043cu0438 slope may be determined on the basis of u0440u0430u0432u043du043eu0432u0435u0441u0438u00a0 forces u0440u0430u0441u043au043bu0438u043du0438u0432u0430u043du0438u00a0 soil repose, afl u0435u0434u0441u0442u0432u0438u0435 his u0434u0438u043bu0430u0442u0435u043du0441u0438u0438 and directed vertically upwards and weight of soil repose, as well as other forces u043fu0440u0435u043fu00a0u0442u0441u0442u0432u0443u044eu0449u0438u0445 recovery of soil, for example u0442u0440u0435u043du0438u00a0 on lateral forces on the u0432u0435u0440u0445u043du043eu0441u0442u0438 u0437u0430u0431u0438u0432u043du043eu0433u043e elementu0437u0430u043au0440u0435u043fu043bu00a0u0435u043cu043eu0439 located above the surface u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 and which can be defined by the formula;where is the specific weight of soil, which is located above the surface u0437u0430u043au0440u0435u043fu043bu00a0u0435u043cu043eu0439 u0441u043au043eu043bu044cu0436u0435u043du0438u00a0 repose depth hu043f; f is the area of repose, u0437u0430u043au0440u0435u043fu043bu00a0u0435u043cu0430u00a0 u0437u0430u0431u0438u0432u043du044cu043cu0438 elements in u043du0438u043cu0430u0435u043cu0430u00a0 equal 1 m2; s forces, u043fu0440u0435u043fu00a0u0442u0441u0442u0432u0443u044eu0449u0438u0435 u0440u0430u0441u043au043bu0438u043du0438u0432u0430u043du0438u044e soil repose in the u0434u0438u043bu0430u0442u0435u043du0441u0438u0438 1 m2.for example, the forces on the lateral surface of the element u0442u0440u0435u043du0438u00a0 soil; non power u0440u0430u0441u043au043bu0438u043du0438u0432u0430u043du0438u00a0 soil repose in the u0434u0438u043bu0430u0442u0435u043du0441u0438u0438 per 1 square meter of soil repose, with 1 m2 square repose in his u043eu0440u0442u043eu0433u043eu043du0430u043bu044cu043du043eu0439 projection.;19. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the cross-section pipes, u043eu0431u044au0435u0434u0438u043du00a0u044eu0449u0438u0445 struts of the probe may be in the form of a square or a m u043du043eu0433u043eu0443u0433u043eu043bu044cu043du0438u043au0430.;20. method and u043fu043eu0432u044bu0448u0435u043du0438u00a0 reliability u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 repose on u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the tip of the probe may have a diameter u043eu0441u043du043eu0432u0430u043du0438u00a0 cone or the size of the u0434u0438u0430u0433u043eu043du0430 if u043eu0441u043du043eu0432u0430u043du0438u00a0 pyramid, a greater diameter or the size of a u0441u0435u0447u0435u043du0438u00a0 connectors, u043eu0431u044au0435u0434u0438u043du00a0u044eu0449u0435u0439 struts of the probe.
机译:1.方法 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u00438 u00a0和 u043f u043e u043e u0432 u044b u0448 u0435 u0435 u043d u0438 u00a0的可靠性,包括工程地质学休养调查,基准系统 u0434 u043b u00a0 u043d u0430 u0431 u043b u044e u0434 u0435 u043d u0438 u00a0 u043c u0438 for defoe u0440 u043c u0430 u0446 u0438 u00a0 u043c u0438休止,在其开发过程中的休止以及对漏洞的利用和加强,以及 u0432 u043e u0437 u0432 u0435 u0434 u0435 u0435 u043d u0438 u00a0由u043e u0432 u0430 u043d u0438 u00a0 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0土壤,以便查看 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性和 u0443 u043c u0435 u043d u043d u044c u0448 u0435 u043d u043d u0438 u00a0劳动密集型工作在 u043e u0442 u043a u043e u0441 04 u0445与水平线1休止的工程地质勘测和 u043f u043e u043b u043e u0436 u0435 u043d u0438 u00a0表面 u0441 u043a u043e u043b u044c u0436 u0435 u043d u0438 u00a0休止深度 u043f u0440 u043e u0438 u0437 u0432 u043e u0434 u00a0 by u0437 u043e u043d u0434 u0438 u0440 u043e u0432 u0430 u043d u0438 u00a0使用手动探针(例如探针 u0440 u0437 u0433-“俄罗斯探针。by u043e ” u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u0438 u00a0来自 u0437 u043e u043d u0434 u0438 u0440 u043e u0432 u0430 u043d u043d u0438 u00a0最小值Pmin电阻感测 u0437 u043e u043d u0434 u0438 u0440 u043e u0432 u0430 u043d u0438 u00a0中的每个孔位于 u043f u0440 u0438 u043c u0435 u0440 u043d范围内 u0440 u043f u0435 u043d u0434 u0438 u043a u0443 u043b u00a0 u0440 u043d u043e u043c u0443机翼休憩区和鞋底,以及 u043f u043e u043b u043e u043436 u0435 u043d u0438 u00a0值Pmin深度 u0434 u043b u00a0表面 u0441 u043a u043e u043b u044c u0436 u0435 u043d u0438 u00a0 u043e u043f u0440 u0435 u0434 u0435 u043b u00a0 u044e u0442公式;其中,hmax和hmin分别是 u043f u043e u043b u043b u043e u0436 u0435 u043d u0438 u00a0范围内的Pmin的最大值和最小值 u043b u00a0放置表面 u0441 u043a u043e u043b u044c u0436 u0435 u043d u0438 u00a0放置,但是,如果切割 u0443 u043b u044c u044c u0442 u0430 u0442 u0430 u043c u0437 u043e u043d u0434 u0438 u0440 u043e u0432 u0430 u043d u0438 u00a0土pose u043f u0440 u0438 u043d u00a0 u0442 u043e决定了观看他的必要性 u0434 u043 u0444 u043e u0440 u043c u0430 u0446 u0438 u00a0 u043c u0438,一个 u0440 u0435 u043f u0435 u0440 u043d u0443 u044e系统 u0437 u0430 u0431 u0438 u043 u043d u044b u0445元素 u043d u0430 u043f u0440 u0438 u043c ep加固杆, u0441 u043e u0441 u0442 u043e u00a0 u0449 u0443 u044e of u0440 u0435 u043f u043 u0440 u043e u0432和此 u0437 u0430 u0431 u0438 u0432 u043d u044b u0435 u0440 u0435 u043f u0435 u0440 u043e u0432元素中的标记位于 h043e u0442 u043a u043e u0441 u0435的深度h上, u043e u043f u0440 u0435 u0434 u0435 u043b u00a0 u0435 u043c u0443 u044e公式;其中h u043f-深度 u043f u043e u043b u043e u0436 u0435 u043d u0438 u00a0表土 u0441 u043a u043e u043b u044c u0436 u0435 u043d u0438 u00a0将其放置在参考框架的驱动元件中,在以下位置可以认为土壤是固定的,其中 u0437 u0430 u0431 u0438 u0432 u043d u043b u043b u0435 al u0435 u043c u0435 u043d u043d u0442 u044b标记具有 u043e u0442 u043a u043e u0441 u0435,并且当存在多个表面时 u0441 u043a u043e u043b u044c u0436 u0435 u043d u0438 u00a0这些元素在土壤中的深度h2 u043e u043f u0440 u0435 u0434 u0434 u0435 u043b u00a0 u0435 u0442 u0441 u00a0 u0434 u043b u00a0最接近表面的表面 u0441 u043a u043e u043b u044c u0436 u0435 u043d u043d u0438 u00a0休养公式;其中最接近h u043f1 u0440 u0430 u0441 u043f u043e u043b u043e u0436 u0435 u0的表面43d u0438 u00a0休止面 u0441 u043a u043e u043b u044c u0436 u0435 u043d u0438 u00a0放置品牌驱动元件,并且 u0434 u043b u00a0更深的表面 u0441 u043a u043e u043b u044c u0436 u0435 u043d u0438 u00a0在土壤中的驱动元素代替休止深度h2,即 u043e u043f u0440 u0435 u0434 u0435 u043b u00a0 u0435 u0442 u0441 u00a0公式;其中h u043fi-深度 u043f u043e u043b u043e u0436 u0435 u043d u043d u00438 u00a0先前较小的表面 u0441 u043a u043e u043b u044c u0436 u0435 u043d u043d u0438 u00a0休息; h u043fi +1是下一个更深的表面 u0441 u043a u043e u043b u044c u0436 u0435 u043d u0438 u00a0 u043f u043e u043b u043e u0436 u0435 u043d u043d u0438 u00a0到位驱动元件图章,在 u0437 u0430 u0431 u0438 u0432 u043d u04b u043b u043c u0438元素之间 u0440 u0430 u0441 u0441 u0442 u043e u00a0 u043d u0435 u0435 u0440 u043e u0432并标记 u043e u043f u0440 u0435 u0434 u0435 u043b u00a0 u0435 u0442 u0441 u00a0公式;其中d是 u0441 u0435 的直径或大小u0447 u0435 u043d u0438 u00a0相关联,并且彼此相对,并且直径为 u0437 u0430 u0431 u0438 u0432 u043d u044b u0445元素的半径为 u0441 u0442 u0432 u043e u00a0 u043d u0440 u0435 u043f u0435 u0440 u0430 u043c u0438和品牌 u0438 u0437 u043c u0435 u0440 u00a0 u044e u0442轮盘之间的 u0438 u0435工程地质研究和地面传感 u0442 u0430 u0442 u0430 u043c观察 u0434 u0435 u0444 u043e u0440 u043c u0430 u0446 u0438 u00a0 u043c u0438决定加强此位置。是土壤休养深度h3中的元素, u043e u043f u0440 u0435 u0434 u0435 u043b u00a0 u0435 u0 43c u0443 u044e公式;其中h u043f-深度 u043f u043e u043b u043e u0436 u0435 u043d u0438 u00a0曲面 u0441 u043a u043e u043b u043b u044c u0436 u0435 u043d u0438 u00a0放置在这些元素所在的位置(在下面这些元素位于其静止不动的位置), u0437 u0430 u0431 u0438 u0432 u043d u044b u0435元素必须免费 u043e u0442 u043a u043e u0431 u0435方案, u043e u043f u0440 u0435 u0434 u0435 u043b u00a0 u0435 u043c u043e u0439计算和 u0443 u0441 u043b u043e u0432 u0438 u00a0 u043c u0438 u043f u04f u043e u0435 u043a u0442 u0438 u0440 u043e u0432 u0430 u043d u0438 u00a0,例如,在国际象棋 u043f u043e u0440 u00a0 u0434 u043a u0435以及 u0437 之前u0430 u0431 u0438 u0432 u043a u043e u0439元素 u043b u0430 u0434 u044b u0432 u0430 u044e u0442在地面上并在其末端将降低 u0437 u0430 u0431 u0438 u0432 u043a u0435是土壤中的元素,而在另一端则很难e上部和 u0437 u0430 u0431 u0438 u0432 u043a u0435元素进入土壤,在 u044b u043f u043e u043b u043d u0435 u043d u043d u043d u044b u0439 u0446 u0435 u043b u0438 u043a u043e u0432 u044b u043c并可能免费提供 u043f u0435 u0440 u0435 u043c u0435 u0449 u0435 u043d u0438 u00a0在 u0437 u0430 u04330 u0431 u0环形锤侧面上的 u0432 u043d u043e u0433 u043e元件的纵向对称轴为pa u0440 u0430 u043b u043b u0435 u043b u044c u043d u043e(例如,p-隐喻地表示为pen) ,四个和 u0438 u043c u0435 u0435 u0442 u0441 u00a0一个或多个切削径向 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0带螺纹的 u0434 u043b u00a0锁定螺栓,然后用钢笔p-创意形式 u043f u043e u0434 u043d u0438 u043c u0430,将锤子放在 u0437 u0430 u0431 u0438 u0432 u043d u044b u043c元素内垂直或笔工作后的倾斜位置向上抬起 u0437 u0430 u0431 u0438 u0432 u043d u043e u0433 u043e元素上的锤子,然后再将 u043f u0440 u0438 u0434 u0430 u0432 u0432 u0430 u00a0手进一步加速到免费的 u043f u0430 u0434 u0435 u043d u0438 u00a0将其推下, u0443 u0434 u0430 u0440 u00a0 u00a0在 u0431 u043e u0439 u043a u043a u0443上,之后再次锤打,然后将 u0443 u0434 u0430 u0440 u00a0 u044e u0442放在 u0431 u043e u0439 u043a u0443上,依此类推。 u043f u043e u0433 u0433 u0440 u0443 u0436 u0435 u043d u0438 u00a0 u0437 u0430 u0431 u0438 u0432 u043d u043e u0433 u043e元素位于 u043e u043a u0430 u0436 u0435 u0435 u0432 u0441 u00a0靠近地面的深度表面,然后环形锤在此位置上的牙齿 u0438 u0432 u043d u043e u043c u0443元素和 u0437 u0430 u043a u0440 u0435 u043f u043b u00a0 u044e u0442高度关闭螺栓,然后将 u043e u0442 u043a u0440 u0435 u043f u043b u00a0 u044e u0442向上移动他 u0437 u0430 u0431 u0438 u0432 u043d u043e u043c u0443元素处于正确的高度,并且 u0437 u0430 u043a u0440 u0435 u043f u043b u00a0 u044e u0442在此高度战斗。锁定螺栓 u043e u0442 u043a u0440 u0435 u043f u043b u00a0 u043e u0442并与 u0437 u0430 u0431 u0438 u0432 u043a u0435元素相对较深,因此,在将 u0437 u0430 u0431 u0438 u0432 u043d u043e u0433 u043e浸入土壤中至所需深度之前,将 u043e u0442 u043a u043e u0441 u0430 u0445与地平线> 10个位于 u0437 u0430 u0431 u0438 u0432 u043a u043e u0439元素之前的土壤 u0443 u0441 u0442 u0430 u043d u0430 u0432 u043b u0438 u0432 u0430 u044e u0442平台,具有水平和 u0434 u043b u00a0工作的创意形式,带有垂直元素的平台朝 u0431 u0440 u043e u0432图片的方向摆放,长到鞋底,并安装在斜坡上的垂直元素后,在土壤中安息; 2.。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。方法 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0和 u043f u043e u0432 u044b u0448 u0435 u043d u043d u0438 u00a0是第1页的可靠性, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0, u0434 u043b u00a0 u0437 u0430 u0431 u0438 u0432 u043d u043e u0433 u043e u0442 u0435 u0440 u0436 u043d u00a0防腐蚀和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0在水平和垂直载荷中的载荷 u0437 u0430 u0431 u0438 u0432 u043d u043e u0439元素m可以使用 u0443 u0448 u0438 u0440 u0435 u043d u0438 u0435 u043c较低, u0437 u0430 u0431 u0438 u0432 u0430 u0435 u043c u043e u043c在基板中,末端以及 u043e u0431 u0440 u0430 u0437 u043e u0432 u0430 u0432 u0448 u0438 u0439 u0441 u00a0在 u0437 u0430 u0431 u0438 u0432 u043a u0435在 u0437 u0430 u0431 u0438 u0432 u043d u043e u0433 u043e元素的侧面与 u0442 u0432 u0435 u0440 u中的地面之间的间隙中0434 u0435 u044e u0449 u0438 u043c及时,例如,在驱动元件的过程中或之后的水泥; 3。方法 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0432 u044b u00a0和 u043f u043e u0432 u044b u00448 u0435 u043d u043d u0438 u00a0的可靠性为1, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0什么先生。隐喻地,平台可以实现为加固100 lee的 u0441 u0432 u0430 u0440 u043d u044b u043c u0438和 u0440 u0435 u0448 u0435 u0435 u0442 u0447 u0430 u0442 u0442 u043b u043b u043c u0438 4。方法 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0432 u044b u00b0和 u043f u043e u043e u0432 u044b u0448 u0435 u043d u043d u0438 u00a0的可靠性u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1,因此可以实现 u0442 u043e u0440 u0446 u0430 u0445圆锤 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0( u0443 u0433 u043b u0443 u0431 u043b u0435 u043d u0438 u00a0) u0434 u043b u00a0 u043f u043e u0434 u043f u043e为了将其固定在给定的高度上,工作中的保险可能会将锤子作为螺栓固定在高关闭口上,并将其固定在高位上。0 0437 040430 0430431 u 0438 u 0043 u043d u043e u0433 u043e元素;; 5。方法 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0和 u043f u043e u0432 u044b u0448 u0435 u043d u043d u0438 u00a0是第1页的可靠性, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0,圆形轴向孔锤和 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0通过 u0434 u0432 u0443 u043c u00a0对称定位的刚性板,带有撞针,连接螺栓ami,通过交叉切割 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0末端带有螺栓的形式为 u0441 u0435 u0447 u0435 u043d u0438 u00a0接近以形成 u0441 u0435 u0447 u0435 u043d u043d u0438 u00a0, u0437 u0430 u0431 u0438 u0432 u0430 u0435 u043c u043e u0433 u043e在其中一个刚性对称板撞针的外表面上 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0 u0434 u043b 可以在尺寸和形状接近于m时加深 u0434 u043b u00a0螺栓来实现。方法 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0432 u044b u00b0和 u043f u043e u043e u0432 u044b u0448 u0435 u043d u043d u0438 u00a0的可靠性u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1,这样轴向孔环锤可以采用不同的横向 u0447 u0435 u043d u0438 u00a0高度,并带有 u0440 u0430 u0441 u0441 u0442 u043e u00a0 u043d u0438 u0438从锤子上取下u,锤子的直径比中间部分大,u的值可由公式;其中h是环形锤的高度。; 7。方法 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0和 u043f u043e u0432 u044b u0448 u0435 u043d u043d u0438 u00a0是第1页的可靠性, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0,在 u0437 u043e u043d u043d u0434 u0438 u0440 u043e u0432 u0432 u0430 u043d u0438 00休息和 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u043e u00a0 u043f u043e u043b u043e u0436 u0435 u043d u043d u0438 u00a0表面 u0441 u043a u043a u043b u044c u0436 u0435 u043d u0438 u00a0可以在 u043e u0442 u043a u043e u0441 u0435上的井中进行钻探深度,并有针对性地取样土壤 u043d u0435 u043d u0430 u0440 u0440 u0443 u0448 u0435 u043d u043d u043e u0439结构和 u0441 u043a u043e u043b u044c u0436 u0435 u043d u0438 u00a0休止位的结构,其次是在实验室中对土壤的机械特性进行定义; 8。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0位于第1页, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0中的 u0432 u0434 u0430 u0432 u043b u0438 u0432 u0430 u043d u0438 u0438针通过支撑物上的孔探入土壤,可能会受到垂直向下的力q的作用,例如以人的体重或在 u0430 u043d u043a中的 u0430 u043d u043a u0435 u0440 u043e u0432 u043a u043e u0439 u043f u00a0 u0442 u044b u0435 u0440 u0430 u043c u0438,例如,以 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0插入 u043f u00a0 u0442 u0435, u0441 u0442 u0435 u0440 u0436 u043d u00a0 u043c u0438与 u0448 u043b u00a0 u043f u043a u0430 u043c u0438并保持土壤从地面到深度为 u0432 u044b u043f u043e u0440 u0430 u043f u043e u0433 u0440 u0443 u0436 u0435 u043d u0438 u00a0可以将强度q定义为lena的公式;其中n是通过将探头浸入土壤中,力在表面上的最大值 u0432 u044b u043f u043e u0440 u0430和直径d1 u043e u0442 u0432 u0432 u0435 u0440 u0441 u0442 u0432 u0438 可以在 u043f u00a0 u0442 u044b u0434 u043b u00a0 nak u043e u043d u0435 u0447 u043d u0438 u043a u0430探针中定义u00a0根据公式;其中d是对角线的直径或大小 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0 u043a u043e u043d u0438 u0447 u0435 u0435 u0441 u043a u043e u0433 u043e或 u043f u0438 u0440 u0430 u043c u0438 u0434 u0430 u043b u044c u043d u043e u043e u0433 u043e针探针和 u043e u043f u043e u0440 u043d u04 u00a0 u043f u00a0 u0442 u0430可以采用圆的形式, u043f u0440 u00a0 u043c u043e u0443 u0433 u043e u043b u044c u043d u0438 u043a u0430等距离轴上 u043e u0442 u0432 u0432 u0435 u0440 u0441 u0441 u0442 u0432 u0435 u0440 u0441 u0442 u0432 u0435 u0442 u0435到外部 u043a u0440 u0430 u00a0的 u043f u00a0 u0442 u044b可由公式m / D1,05。; 9定义。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0放在 u043e u0442上u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1,因此m u043e u0431 u044a u0435 u0434 u0438 u043d u00a0 u044e u0449 u0435 u0439支撑杆耦合探针的长度可能超过探针的两个接头杆的n螺纹的接头长度,并且公式为10 .; 10。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0位于第1页, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0, u0441 u043f u0435 u0446 u043c u0443 u0444 u0444 u0442 u0430, u043e u0431 u0435 u0434 u0438 u043d u00a0 u044e u0449 u0430 u00a0冲击锤的探针点可以通过中心 u043e u0442 u0432 u0435 u0440 u0441 u0442 u0438 u00a0 u043c u0438( u0443 u0433 u043b u0443 u0431 u043b u0435 u043d u0438 u00a0 u043c u0438)在其支杆zo yeah的下面,中间有一个横向隔板,可以实现以两个 u0443 u0441 u0435 u0447 u0435 u043d u043d u044b u0445圆锥的形式,在上下部 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0 u043c u0438,以及更多的 u00a0 u0432 u043b u00a0 u0435 u0442 u0441 u00a0 u0442 u043e u0440 u0446 u0430 u043c u0438 u0441 u043f u0435 u0446 u0 43c u0443 u0444 u0442 u044b。; 11。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0位于第1页, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0在 u0441 u043f u0435 u0446 u043c u043c u0443 u0444 u0442 u044b的侧面上固定例如槽杆,接头 u0445 u043e u043c u0443 u0442 u043e u043c具有派生完全平行的平行杆 u043f u0435 u0440 u0435 u043c u0435 u0449 u0435 u043d u0438 u00a0,而在并行安装的 u0441 u0442 u0435 u0440 u0436 u043d u00a0的末尾,例如,凹槽型反射器 u0434 u043b u00a0激光轮盘,带有 u043f u0430 u0440 u0430 u043b u043b u0435 u043b u044c u043d u044b u0439杆可以固定发动机螺栓。安装在喷嘴环的凹槽中; 12。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0放在 u043e u0442上u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1,以便可以加强 u043b u0430 u0437 u0435 u0440 u043d u0430 u00a0轮盘赌,例如,在垂直于探头的网上雕刻,以及 u043b u0430 u0437 u0435 u0440 u043d u0430 u00a0轮盘 u0440 u0430 u0441 u043f u043e u043b u0430 u0433 u0430 u0435 u0442 u0441 u00a0以上品牌- u043e u0442 u0440 u0430 u0436 u0440 u0430 u0441 u0441 u0442 u043e u00a0 u043d u0438 u0438上的u0442 u0435 u043b u00a0,由激光轮盘和 u0441 u043b u043e u0432 u0438 u00a0 u043c u0438生产工作; 13。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0放在 u043e u0442上u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1,这样连接器的侧面 u043e u0431 u044a u0435 u0434 u0438 u043d u00a0 u044e u0449 u0438 u0445撑杆也可以是垂直的 u0440 u0435 u0431 u0440探针; 14。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0放在 u043e u0442上u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1,以便可以将面板开口定位在 u0441 u043f u0435 u0446 u043c u0443 u0444 u0442 u044b弹性垫片,例如措施 u0434 u0435 u0440 u0435 u0432 u00a0 u043d u043d u044b u0435。; 15。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0放在 u043e u0442上u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1,这样,铁路路堤上的 u0437 u0430 u0431 u0438 u0432 u043d u044b u0445元素的参考框架就可以安排在兄弟。 u0432 u043a u0438静止,并且说唱歌手位于 u043c u0435 u0436 u0434 u0443 u043f u0443 u0442 u044c u0435。; 16。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0位于第1页, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0但是,在筑堤时 u0440 u0430 u0437 u0440 u044b u0445 u043b u0435 u043d u043f u0440 u0438 u043b u0435 u0433 u0430 u044e u0449 u0430 u00a0休止符表面上的 u043d u0430 u00a0区域, u043e u0431 u0431 u0440 u0430 u0437 u043e u0432 u0430 u0432 u0448 u0430 u00a0 u0441 u00a0以及技术上的原因以及 u0442 u0438 u00a0 u0432 u0435 u0440 u043e u00a0 u0442 u043d u043d u043e u0439表面的面积u0441 u043a u043e u043b u044c u0436 u0435 u043d u0438 u00a0休止符(可能是开发过程中变形的原因),可以被阻止 u0430 u0440 u043c u0438 u0440 u0443 u044e u0449 u0438 u043c材料午睡器 u0430 u0440 u043c u0430 u0442 u0443 u0440 u043d u044b u043c u0438的宽度为区域 u043f u0435 u0440 u0435 u043a u0440 u044b u0442 u0438 u00a0 s可以通过以下公式定义;其中l是 u043d u0435 u0443 u0433 u043f u043f u043b u043e u0442 u043d u0435 u043d u043d u043e u0433 u043e土壤休养处, u043f u0440 u0438 u043b u0435 u0435 u0433 u0430 u044e u0449 u0430 u00a0到其表面或表面 u0440 u0430 u0441 u0441 u0442 u043e u00a0 u043d u0438 u0435置于势能面 u0441 u043a u043e u043e u043b u044c u0436 u0435 u0435 u043d u0438 u00a0,宣讲要吃加固土将 u0432 u044b u043f u043e u043b u043d u00a0 u044e u0442 u043f u043e u0441 u043b u043e u0439 u043d u043e作为他的 u0432 u043e u0437 u0432 u0435 u043 u0435 u043d u0438 u00a0。; 17。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0放在 u043e u0442上u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1,因此可以通过钢筋网格来执行具有创意的平台; 18。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0位于第1页, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0, u0440 u0430 u0441 u0441 u0442 u043e u00a0 u043d u0438 u0435位于 u0437之间u0431 u0438 u0432 u043d u044b u043c u0438元素 u0443 u043a u0440 u0435 u043f u043b u00a0 u044e u0449 u0438 u043c u043c u0438的坡度可以基于 u0440 u0430确定 u0432 u043d u043e u0432 u0435 u0441 u0438 u00a0强制 u0440 u0430 u0441 u043a u043b u0438 u043d u0438 u0432 u0430 u043d u0438 u00a0土pose u0434 u0441 u0442 u0432 u0438 u0435他的 u0434 u0438 u043b u0430 u0442 u0435 u043d u0431 u0438 u0438并指向垂直上方,土壤的重量以及其他力 u043f u0440 u0435 u043f u00a0 u0442 u0441 u0442 u0432 u0443 u044e u0449 u0438 u0445土壤恢复,例如 u0442 u0440 u0435 u043d u0438 u00a0对 u0432 u0435 u0440 u0445 u043d u043e u0441 u0441 u0442 u0438 u0437 u0430 u0431 u0438 u0432 u043d u043e u0433 u043e元素 u0437 u0430 u043a u0440 u0435 u043f u043b u00a0 u0435 u043c u043e u0439位于表面上方 u0441 u043a u043e u043e u043b u044c u0436 u0435 u043d u0438 u00a0可以由公式定义;其中土壤的比重位于表面上方 u0437 u0430 u043a u0440 u0435 u043f u043b u00a0 u0435 u043c u043e u0439 u0441 u043a u043e u043b u044c u0436 u0435 u043d u0438 u00a0休止深度h u043f; f是休憩区域, u0437 u0430 u043a u0440 u0435 u043f u043b u00a0 u0435 u043c u0430 u00a0 u0437 u0430 u0431 u0438 u0432 u043d u043d u043c u043c u0438元素在 u043d u0438 u043c u0430 u0435 u043c u0430 u00a0中等于1平方米; s Forces, u043f u0440 u0435 u043f u00a0 u0442 u0441 u0442 u0432 u0443 u044e u0449 u0438 u0435 u0440 u0430 u0441 u0431 u043a u043b u0438 u043d u0438 u043 u0430 u043d u0438 u044e的土壤位于 u0434 u0438 u043b u0430 u0442 u0435 u043d u0441 u0438 u0438 1 m2中,例如,作用在单元 u0442 u0440侧面上的力 u0435 u043d u0438 u00a0土壤;非电源 u0440 u0430 u0441 u043a u043b u0438 u043d u0438 u0432 u0430 u043d u0438 u00a0土壤存放在 u0434 u0438 u043b u0430 u0442 u0435 u043d u0441 u0438 u0438每1平方米的土壤歇息地,在他的 u043e u0440 u0442 u043e u0433 u043e u043d u0430 u043b u044c u043d u043e u0439投影中有1平方米的土地。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0放在 u043e u0442上u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1,因此横截面管道为 u043e u0431 u044a u0435 u0434 u0438 u043d u00a0 u044e u0449 探头的u0438 u0445支柱可以是正方形或 u043d u043e u0433 u043e u0443 u0433 u043e u043b u044c u043d u0438 u043a u0430。; 20。方法和 u043f u043e u0432 u044b u0448 u0435 u043d u0438 u00a0可靠性 u043e u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0放在 u043e u0442上u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1,因此探针的尖端直径可能为 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0圆锥体或 u0434 u0438 u0430 u0433 u043e u043d u0430的大小,如果 u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0金字塔,直径较大或 u0441 u0435 u0447 u0435 u043d u0438 u00a0连接器, u043e u0431 u044a u0435 u0434 u0438 u043d u00a0 u044e u0449 u0435 u0439支柱。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号