METHOD FOR OPENCAST STEEP DEPOSIT MINING

机译:露天矿开采的方法

摘要

FIELD: mining, particularly opencast mining of mineral deposits in the case of limited vertical ore bodies, for instance kimberlite pipes.;SUBSTANCE: method involves forming pit sides having inclinations less than minimal possible ones to provide pit side stability; preparing rock for further excavation by drilling-and-blasting operations; transporting ore and overburden via main incline by wheeled vehicle; forming transfer point plate at the second stage; excavating up to design depth along with forming pit sides having maximal possible inclinations, which provide pit side stability; cutting main incline from transfer point plate, wherein inclination thereof is increased in longitudinal direction; cutting ore pillars of the first stage; forming pit side having high ledges; forming lower ledge along ore body outline; forming temporary incline in one pit part; transporting ore and overburden to transfer point plate by means of caterpillar vehicle; forming temporary incline to provide pit cutting to design depth and cutting ore pillars under temporary incline.;EFFECT: increased efficiency of deposit excavation due to reduced overburden volume within the bounds of deep limited pits.;3 cl, 1 ex, 1 tbl, 4 dwg
机译:领域:方法:涉及形成具有小于最小可能倾斜度的倾角以提供矿井侧稳定性的矿井侧,例如在金伯利岩管的垂直矿体中的露天开采。通过钻孔和爆破操作准备岩石以进一步开挖;轮式车辆通过主坡运输矿石和上覆岩层;在第二阶段形成转移点板;开挖至设计深度,并形成具有最大可能倾角的矿坑侧面,从而提供矿坑侧面稳定性;从转移点板切割主倾斜面,其中其倾斜度在纵向方向上增加;切割第一阶段的矿石支柱;形成具有高壁架的坑侧;沿矿体轮廓形成下部壁架;在一个坑部分形成临时倾斜;用履带车将矿石和覆土运到转运点板;形成临时坡度以提供坑深切割以达到设计深度,并在临时坡度下切割矿柱dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号