You allotting the inner wall surface of the tunnel drilling machine null tunnel which has

机译:您分配隧道钻机的空洞内壁表面

摘要

PPROBLEM TO BE SOLVED: To provide a concrete placing device which contributes to shortening of a concrete placing line washing time and achieves setup of re-excavation in a short period of time, and also to provide a tunnel excavator equipped with the concrete placing device. PSOLUTION: The concrete placing device is comprised of: an inner form S; and an end form 46 for securing a concrete placement space E between the inner form and a peripheral wall of the natural ground. The end form has a concrete placing pipe 50 inserted therein and fixed thereto, and has a sliding block valve device 60 built therein. The block valve device has a slide jack 63 and a slide valve body 65, and by extension/contraction of the slide jack, either a first connecting pipe portion 69 to which a concrete placing pipe arrangement 51 is connected or a second connecting pipe portion 70 to which a thrusting jack 71 is connected, selectively communicates with the concrete placing pipe. When the second connection pipe portion 70 communicates with the concrete placing pipe, the thrusting jack is extended, and a rod piston 72 connected to the rod tip of the jack, advances, to thereby push concrete remaining in the concrete placing pipe into a concrete placement space. PCOPYRIGHT: (C)2007,JPO&INPIT
机译:

要解决的问题:提供一种混凝土放置装置,其有助于缩短混凝土放置线的清洗时间并在短时间内实现重新挖掘的设置,并且还提供一种配备有混凝土的隧道挖掘机放置装置。

解决方案:混凝土放置装置包括:内部模板S;端模46用于在内部模和自然地面的周壁之间确保混凝土放置空间E。该端模具有插入并固定在其中的混凝土放置管50,并且具有内置在其中的滑块阀装置60。截止阀装置具有滑动千斤顶63和滑动阀体65,并且通过滑动千斤顶的伸展/收缩,连接有混凝土放置管布置51的第一连接管部分69或第二连接管部分70连接有推力千斤顶71的混凝土选择性地与混凝土放置管连通。当第二连接管部分70与混凝土浇注管连通时,推力千斤顶伸出,并且与千斤顶的杆尖相连的杆活塞72前进,从而将残留在混凝土浇注管中的混凝土推入混凝土浇注中。空间。

版权:(C)2007,日本特许厅&INPIT