Topic The random winding coming of the wire and the kink due to that it is not generated, at the same time safety it offers the lift for foothold job whose smooth ascent and descent is possible. SolutionsThe space being locked by the longitudinal pipe 1 of both sides of C for carrier ascent and descent which is opened to the vertical to portion of foothold A and the foothold A where framework was formed by the flexible pipe for foothold and the space, C for carrier ascent and descent as ascent and descent carrier it is provided in the both sides section of 10 of the basket die which is laid out in guide carriage rail 5 of the pair which is installed vertically and the space C for carrier ascent and descent and ascent and descent carrier, 10 in order guide carriage rail 5 of pair run, it turns, the guide idler unit in the first section of 11 which regulates the position of horizontal direction of ascent and descent carrier 10 and the space C for carrier ascent and descentWhen the electromotive belt block 13 which hoists the belt 14 which is installed, is adhered to the top of ascent and descent carrier 10 and ascent and descent carrier 10 fell at speed above specified, operating, the lift for foothold job which has with the safe block 17 which makes ascent and descent carrier halt 10. Choice figure Drawing 2
展开▼