PROJECT SUPPORTING METHOD, EXECUTION PROGRAM THEREFOR, AND EXECUTION DEVICE THEREFOR

机译:项目支持方法,执行程序以及执行设备

摘要

Data to support a determination as to whether or not a project can be executed, etc., is provided on the basis of a cost estimation value of project deliverables.Regarding a risk event parameter group which is a collection of risk event parameters indicating a degree of estimation risk for each of a plurality of estimation risk events, the similarity between risk event parameter groups of a plurality of past projects and a risk target parameter group of a target project is obtained (S41 to S43), the top N past projects in terms of the similarity to the target project is extracted from the plurality of past projects (S43), a cost deviation of a cost estimation value of the target project is obtained from the cost estimation value and the actual value of each of the N past projects (S45, S46), cost fluctuation information is created on the basis of the cost deviation of the target project (S47), and the cost fluctuation information is displayed.
机译:基于项目可交付成果的成本估算值,提供支持确定是否可以执行项目等的数据。关于作为指示多个估计风险事件中的每一个的估计风险程度的风险事件参数的集合的风险事件参数组,多个过去项目的风险事件参数组与风险目标参数组之间的相似性。获得目标项目(S41至S43),从多个过去项目中提取与该目标项目的相似度最高的N个过去项目(S43),该目标项目的成本估计值的成本偏差为从N个过去的项目的每个的成本估计值和实际值获得(S45,S46),基于目标项目的成本偏差创建成本波动信息(S47),并显示成本波动信息。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号