首页> 外国专利> HARDWARE IMPLEMENTED METHOD OF BUILDING PLANNING (OPTIONS), PLANNING SYSTEM OF BUILDINGS AND MACHINE READABLE MEDIA

HARDWARE IMPLEMENTED METHOD OF BUILDING PLANNING (OPTIONS), PLANNING SYSTEM OF BUILDINGS AND MACHINE READABLE MEDIA

机译:硬件实现的建筑规划方法(选件),建筑规划系统和机器可读媒体

摘要

1. A hardware-implemented method for scheduling tasks, comprising determining the possibility of planning the use of a particular computing task for a particular resource based on the loading of this resource and the loading criterion related to this resource and associated with a specific computing task. ! 2. The method according to 1, which further comprises determining the expected load of a particular resource by a computational task, the load criterion being set based on the expected load. ! 3. The method according to claim 2, in which the step of determining the expected load comprises analyzing the instructions of the computational task. !four. The method of claim 2, wherein the step of determining the expected load comprises: estimating a value that describes the previous load of a particular resource by a computational task; and! setting the expected load based on the recorded value that describes the previous load. ! 5. The method according to claim 1, further comprising obtaining a download criterion from an application program that is the source of the computing task. ! 6. The method according to claim 1, further comprising recording a computational task in at least one of several resource-oriented planning worklists. ! 7. The method according to 1, which additionally contains a record of each of several computational tasks that must be scheduled to be executed in at least one of several work-oriented planning lists, and the work lists correspond to computer resources, and a specific work list contains computational tasks that are awaiting execution using
机译:1.一种用于调度任务的硬件实现的方法,包括:基于该资源的负载以及与该资源有关并且与特定计算任务相关联的负载标准,确定针对特定资源来计划使用特定计算任务的可能性。 。 ! 2.根据权利要求1所述的方法,其进一步包括通过计算任务来确定特定资源的预期负载,所述负载标准是基于所述预期负载而设置的。 ! 3.根据权利要求2所述的方法,其中,确定预期负荷的步骤包括分析所述计算任务的指令。四。 3.根据权利要求2所述的方法,其中,确定预期负载的步骤包括:估计通过计算任务描述特定资源的先前负载的值;以及和!根据描述先前负载的记录值设置预期负载。 ! 5.根据权利要求1所述的方法,还包括:从作为所述计算任务的源的应用程序获得下载标准。 ! 6.如权利要求1所述的方法,还包括将计算任务记录在几个面向资源的计划工作清单中的至少一个中。 ! 7.根据权利要求1所述的方法,其另外包含在若干面向工作的计划列表中的至少一个中必须计划执行的多个计算任务中的每一个的记录,并且所述工作列表对应于计算机资源,并且工作清单包含等待使用以下命令执行的计算任务

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号