A process management method and system for developing an embedded system using a plurality of project views is disclosed. Each project view is assigned to a different entity. The method includes associating one or more objectives with a respective project view and linking one or more embedded system deliverables to the one or more objectives. The method further includes, for a respective objective: (1) linking at least one functional requirement to the respective objective, and (2) linking at least one test result to the respective objective to validate that the embedded system deliverables linked to the respective objective satisfy the at least one functional requirement. The method also includes presenting, in the respective project view, status information of the objectives assigned to a respective entity.
展开▼