首页> 外国专利> PARTIALLY AND FULLY EARTH-ANCHORED CABLE-STAYED BRIDGE USING MAIN SPAN PRESTRESSING APPRATUS AND CONSTRUCTION METHOD FOR THE SAME

PARTIALLY AND FULLY EARTH-ANCHORED CABLE-STAYED BRIDGE USING MAIN SPAN PRESTRESSING APPRATUS AND CONSTRUCTION METHOD FOR THE SAME

机译:主跨预压装置的局部全锚索桥及其施工方法

摘要

on the deck segments that are installed on the cable-stayed bridge with a main span tension means comprising a tension device and a tension member and the tensile stress introduced by the role of the conventional aerodynamic cable at the same time can be reduced to enable the cross sectional area of the main span of the deck segments by reducing the size of the maximum compression stress acting on the end face of the deck segments of the main span , cable-stayed bridge has been disclosed in accordance with this economically the compressive stress caused in whole or in part, it makes it possible to compensate for the main span tensile stress due to the tension member . ;
机译:在安装在斜拉桥上的甲板段上的主段张紧装置上,该张紧装置包括张紧装置和张紧构件,同时传统气动电缆的作用所引入的张应力可以减小,从而使通过减小作用在主跨段甲板段端面上的最大压缩应力的大小来减小主段跨段的横截面面积,根据这种方法在经济上公开了斜拉桥所引起的压缩应力整体或部分地,它可以补偿由于受拉构件引起的主跨度拉应力。 ;

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号