首页> 外国专利> Method for modernizing lift system in building, involves controlling travel of lift car by operation part for implementation of modernization in lift shaft, and installing new control device, so that temporary control device is removed

Method for modernizing lift system in building, involves controlling travel of lift car by operation part for implementation of modernization in lift shaft, and installing new control device, so that temporary control device is removed

机译:用于建筑物中的电梯系统的现代化的方法,包括通过操作部控制电梯轿厢的行进以在电梯井中实现现代化,并安装新的控制装置,从而去除临时控制装置

摘要

The method involves providing a temporary control device (30) with a control part (32) and an operation part (36). A signal-conducting connection is formed between the control and operation parts. A voltage source i.e. site electricity distributor (54), a drive device (16) and a brake device (22) are attached to the control part. Travel of a lift car (12) is controlled by the operation part for implementation of modernization and assembly works in a lift shaft (14). An existing control device is repaired or a new control device is installed. The temporary control device is removed. An independent claim is also included for a control device for temporary controlling a lift system.
机译:该方法包括为临时控制设备(30)提供控制部分(32)和操作部分(36)。在控制部分和操作部分之间形成信号传导连接。电压源,即现场配电器(54),驱动装置(16)和制动装置(22)附接到控制部分。升降机轿厢(12)的行进由操作部件控制,以实现在升降机井(14)中的现代化和装配工作。修理现有的控制设备或安装新的控制设备。临时控制设备已卸下。还包括用于临时控制电梯系统的控制装置的独立权利要求。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号