Reservations implementation method for use in reinforced concrete walls in building site, involves providing formwork and reservation device that are allowed to remain in place so as to allow realization of suspended floor
Reservations implementation method for use in reinforced concrete walls in building site, involves providing formwork and reservation device that are allowed to remain in place so as to allow realization of suspended floor
The method involves providing formwork and a reservation device that is positioned inside the formwork. The formwork and the reservation device are arranged to create reservations in a reinforced concrete wall (10). The formwork and the reservation device are allowed to remain in place so as to allow realization of suspended floor. A set of cells (5) is provided in the wall. The floor is anchored in the web. An independent claim is also included for a device for implementation of reservations in reinforced concrete walls.