The process of development of oil deposits in layered fractured carbonate reservoirs, in which the drilling of vertical injection and production wells is carried out, water injection through injection wells, production wells selected products. Before drilling horizontal sidetracks (BGS) of marginal or abandoned wells or horizontal wells it is determined the structural-tectonic scheme put, the distribution of productive layers and hydrodynamic isolation jumpers between them in the area and the section of the deposit. It is built a more permanent geological-technological model (PDGTM) determined the zones of the localization of potential maximum of intensity of filtration of residual reserves. It is determined the effective volume of water injection and conductivity of the major tectonic disturbances in step PDGTM adaptation using the results of the trace flow filtration. It is determine the area of localization of the maximum capacity of the filtration rate, subject to availability zones of spread hydrodynamic isolation bridges between watered and oil-saturated reservoir, which is equal to or more of drainage areas of producing vertical well. In areas of potential localization the filter intensity is determined by the location of the vertical / horizontal wells, BGS from marginal wells or liquidated.
展开▼