首页> 外国专利> WATER CUT-OFF SYSTEM, WATER CUT-OFF METHOD, AND CONSTRUCTION METHOD FOR WALL BODY

WATER CUT-OFF SYSTEM, WATER CUT-OFF METHOD, AND CONSTRUCTION METHOD FOR WALL BODY

机译:隔水系统,隔水方法和墙体的施工方法

摘要

PROBLEM TO BE SOLVED: To provide a system and a method for removing a water cut-off tool for a preceding tunnel that interferes with a following tunnel, without impairing the water cut-off performance.SOLUTION: The system is a water cut-off system for cutting off water between an entrance wall and a shield tunnel penetrating through the entrance wall, and includes one or more freezing pipes 30 extending in a tunnel axis direction along an inner wall of the shield tunnel and having a coolant circulated therethrough. By circulating the coolant through the one or more freezing pipes 30, groundwater 16 contained in soil 15 adjacent to the entrance wall and an exterior wall of the shield tunnel is frozen, thus constructing a frozen improvement body 31, and the frozen improvement body 31 is utilized for water cut-off.SELECTED DRAWING: Figure 3
机译:要解决的问题:提供一种在不影响除水性能的情况下为前道带来干扰的系统和方法,该系统和方法可去除前道的水干扰。用于在入口壁和穿过入口壁的屏蔽隧道之间切断水的系统,并且包括一个或多个冷冻管30,其沿屏蔽轴线的内壁在隧道轴线方向上延伸并且使冷却剂循环通过。通过使冷却剂通过一个或多个冷冻管30循环,冻结包含在与盾构隧道的入口壁和外壁相邻的土壤15中的地下水16,从而构造了冷冻改良体31,并且冷冻改良体31为用于断水选定的图纸:图3

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号