New and old building integrated stringing shop construction method

机译:新旧楼综合穿线店的施工方法

摘要

PROBLEM TO BE SOLVED: To reduce processes and costs by reducing the temporary reinforcement for overturn prevention and temporary reinforcement during movement of a storage external wall on the premise of moving(building-moving) the storage external wall in order to use the external wall of an existing building as a part of the external wall of a new building.;SOLUTION: The skeleton construction of a new building is performed at a plane position prior to the movement of a storage external wall 1, and before the storage external wall 1 is moved, the storage external wall 1 is integrated with a structure frame 2 of the new building, and the storage external wall 1 and the structure frame 2 of the new building are simultaneously moved to the position of the new building by a building-movement method, and the structure frame 2 of the new building is integrated with a foundation.;COPYRIGHT: (C)2013,JPO&INPIT
机译:要解决的问题:通过减少为防止倾覆而使用的临时加固物以及在移动(建筑物移动)存储外墙以使用仓库外墙的前提下,在存储外墙移动过程中进行临时加固来减少工序和成本。解决方案:新建筑物的骨架结构是在移动存储外墙1之前,在移动存储外墙1之前的平面位置执行的。移动后,将存储外墙1与新建筑物的结构框架2集成在一起,并通过建筑物移动方法将存储外墙1和新建筑物的结构框架2同时移动到新建筑物的位置,并且新建筑物的结构框架2与基础集成在一起。;版权所有:(C)2013,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号