首页>
外国专利>
New and old building integrated stringing shop construction method
New and old building integrated stringing shop construction method
展开▼
机译:新旧楼综合穿线店的施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To reduce processes and costs by reducing the temporary reinforcement for overturn prevention and temporary reinforcement during movement of a storage external wall on the premise of moving(building-moving) the storage external wall in order to use the external wall of an existing building as a part of the external wall of a new building.;SOLUTION: The skeleton construction of a new building is performed at a plane position prior to the movement of a storage external wall 1, and before the storage external wall 1 is moved, the storage external wall 1 is integrated with a structure frame 2 of the new building, and the storage external wall 1 and the structure frame 2 of the new building are simultaneously moved to the position of the new building by a building-movement method, and the structure frame 2 of the new building is integrated with a foundation.;COPYRIGHT: (C)2013,JPO&INPIT
展开▼