The team Planning sequences of Rilling 14 includes a module that determines the initial position 18 to determine a location of a Mobile Drilling team of 12. A Selection Module Selects a destination location for 24 12 Drilling Equipment.A module that provides the Broker 26 provides a Corridor between the initial location of the drilling team of 12 and its Destination Location, taking the corridor width selected.The processing unit is responsible for the modules 28, 18, 24 and 26 to select a location Hole of Every Hole within the corridor will be drilled by the drilling Team 12, sequentially as it moves from its initial location to location of des Tino.