首页> 外国专利> REAL-TIME AND POST-JOB DESIGN OPTIMIZATION WORKFLOWS

REAL-TIME AND POST-JOB DESIGN OPTIMIZATION WORKFLOWS

机译:实时和后作业设计优化工作流程

摘要

A method of producing hydrocarbons from a well includes optimizing a treatment schedule of a hydraulic fracturing process to be performed on a well based on a formation model that predicts a modification to a geological formation based by a hydraulic fracturing process and a modified formation model, based on the modification,that predicts production of a well. The method may further include updating a treatment schedule of the hydraulic fracturing process to form an updated treatment schedule, performing a hydraulic fracturing process on a well based on the updated treatment schedule to form a fractured well, and producing hydrocarbons from the fractured well.
机译:一种从井中生产碳氢化合物的方法,包括基于预测通过水力压裂过程和修改后的地层模型对地质地层进行改造的地层模型,对要在井上进行的水力压裂过程的处理时间表进行优化,根据修改,可以预测井的产量。该方法还可包括:更新水力压裂工艺的处理时间表以形成更新的处理时间表;基于更新的处理时间表在井上执行水力压裂过程以形成压裂井;以及从压裂井生产碳氢化合物。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号