首页>
外国专利>
Thermo-economic modeling and optimization of a combined cooling, heating, and power plant
Thermo-economic modeling and optimization of a combined cooling, heating, and power plant
展开▼
机译:制冷,供暖和发电厂联合的热经济建模和优化
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method to manage operating costs of a combined cooling heating and power (CCHP) plant that includes converting complex models of underlying components of the plant into simplified models (S101), performing an optimization that uses the simplified models as constraints of the optimization to output at least one decision variable (S102), and adjusting controls of the plant based on one or more of the output decision variables (S103).
展开▼
机译:一种管理冷热电联产工厂运营成本的方法,该方法包括将工厂基础组件的复杂模型转换为简化模型(S 101 B>),并使用简化后的模型进行优化模型作为优化约束,以输出至少一个决策变量(S 102 B>),并根据一个或多个输出决策变量(S 103 B >)。
展开▼