首页> 外国专利> Technique for determining whether to reestablish fast rerouted primary tunnels based on backup tunnel path quality feedback

Technique for determining whether to reestablish fast rerouted primary tunnels based on backup tunnel path quality feedback

机译:基于备用隧道路径质量反馈确定是否重新建立快速重路由主隧道的技术

摘要

In one embodiment, a primary tunnel is established from a head-end node to a destination along a path including one or more protected network elements for which a fast reroute path is available to pass traffic around the one or more network elements in the event of their failure. A first path quality measures path quality prior to failure of the one or more protected network elements. A second path quality measures path quality subsequent to failure of the one or more protected network elements, while the fast reroute path is being used to pass traffic of the primary tunnel. A determination is made whether to reestablish the primary tunnel over a new path that does not include the one or more failed protected network elements, or to continue to utilize the path with the fast reroute path, in response to a difference between the first path quality and the second path quality.
机译:在一个实施例中,沿着包括一个或多个受保护的网络元件的路径从头端节点到目的地建立主要隧道,在发生以下情况时,该路径可使用快速重路由路径在一个或多个网络元件周围传递业务。他们的失败。第一路径质量在一个或多个受保护的网络元素发生故障之前测量路径质量。第二个路径质量用于测量一个或多个受保护的网络元素发生故障之后的路径质量,同时使用快速重路由路径传递主隧道的流量。响应于第一路径质量之间的差异,确定是在不包括一个或多个故障受保护网络元素的新路径上重建主隧道,还是继续使用具有快速重路由路径的路径。和第二条路径质量。

著录项

  • 公开/公告号US9774523B2

    专利类型

  • 公开/公告日2017-09-26

    原文格式PDF

  • 申请/专利权人 CISCO TECHNOLOGY INC.;

    申请/专利号US201414537772

  • 申请日2014-11-10

  • 分类号H04L12/703;H04J3/14;H04L12/46;H04L12/707;H04L12/723;H04L12/773;

  • 国家 US

  • 入库时间 2022-08-21 13:45:36

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号