首页>
外国专利>
INVERSE CONSTRUCTION METHOD FOR DEEP, LARGE AND LONG PIT ASSEMBLING STRUCTURE OF SUSPENSION-TYPE ENVELOPE ENCLOSURE
INVERSE CONSTRUCTION METHOD FOR DEEP, LARGE AND LONG PIT ASSEMBLING STRUCTURE OF SUSPENSION-TYPE ENVELOPE ENCLOSURE
展开▼
机译:悬挂式围护结构的深,大,长坑装配结构的逆向构造方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to the field of construction of underground buildings, specifically to an inverse construction method for a deep, large and long pit assembling structure of a suspension-type envelope enclosure. A method includes design and calculation; engineering construction of foundation piles; control over underground water; construction of a pit enclosure; building of a basement reinforcing and anti-seeping layer; inverse construction; and floor structure construction. By the inverse construction method for a deep, large and long pit assembling structure of a suspension-type envelope enclosure of the present invention, the pit construction quality is easily controlled, the basement is well waterproofed and easily monitored, and the quality control, service and maintenance are easy.
展开▼