首页> 外国专利> PROCEDURE FOR INSTALLING A OFFSHORE WINDOW TOWER TOWER, WITH PILE BASED FOUNDATIONS AND EQUIPMENT IMPLEMENTATION PROCEDURES

PROCEDURE FOR INSTALLING A OFFSHORE WINDOW TOWER TOWER, WITH PILE BASED FOUNDATIONS AND EQUIPMENT IMPLEMENTATION PROCEDURES

机译:使用桩基基础和设备实现程序安装离岸窗户塔的程序

摘要

Method for installation of an offshore tower, which comprises: providing a tower mast, piles, anchoring means, a platform with securing means, and buoyancy means with securing means; fastening piles to platform; fastening mast to platform in the use position; providing actuation and/or braking means between piles and platform; providing a platform between lower zone and upper zone; anchoring means to piles and to platform; launching buoyancy means; launching base assembly (platform, mast, piles, anchoring means); securing base assembly to buoyancy means using securing means; transferring transport assembly to tower location; actuating actuation and/or braking means until piles are fixed in the seabed; fastening piles to seabed; actuating actuation and/or braking means until platform is on a level with pile upper zone; mounting wind turbine on mast; removing securing means and withdrawing buoyancy means from platform; and tensioning anchoring means.
机译:一种海上塔架的安装方法,包括:提供塔架,桩,锚固装置,具有固定装置的平台以及具有固定装置的浮力装置;以及将桩固定在平台上;在使用位置将桅杆固定在平台上;在桩和平台之间提供致动和/或制动装置;在下部区域和上部区域之间提供平台;在桩和平台上的锚固方式;发射浮力;发射基座组件(平台,桅杆,桩,锚固装置);使用固定装置将基座组件固定到浮力装置上;将运输组件转移到塔架位置;致动致动和/或制动装置,直到将桩固定在海底;将桩固定在海床上;致动致动和/或制动装置,直到平台与桩上部区域处于同一水平;将风力涡轮机安装在桅杆上;从平台上卸下固定装置并撤出浮力装置;和张紧锚固装置。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号