Method for installation of an offshore tower, which comprises: providing a tower mast, piles, anchoring means, a platform with securing means, and buoyancy means with securing means; fastening piles to platform; fastening mast to platform in the use position; providing actuation and/or braking means between piles and platform; providing a platform between lower zone and upper zone; anchoring means to piles and to platform; launching buoyancy means; launching base assembly (platform, mast, piles, anchoring means); securing base assembly to buoyancy means using securing means; transferring transport assembly to tower location; actuating actuation and/or braking means until piles are fixed in the seabed; fastening piles to seabed; actuating actuation and/or braking means until platform is on a level with pile upper zone; mounting wind turbine on mast; removing securing means and withdrawing buoyancy means from platform; and tensioning anchoring means.
展开▼