首页> 外国专利> Handling, Transportation and Installation of Railway Main Road

Handling, Transportation and Installation of Railway Main Road

机译:铁路干线的装卸,运输和安装

摘要

The loading and unloading, transportation and installation methods of railway trunk roads do not need to make railway trunk roads closer after each welding strip unloading cycle.Stop at the end of the installed lane until all BLS are completely unloaded. One way is to tie the two lanes to a pile of unloading carriages and then use a mop along the carriage to facilitate their descent to the road. A moving shooting and positioning machine leaves behind lanes supported by vehicles on installed sections; these lanes move from installed sections to naughty sections; and from these lanes to their P sections. Finally, with the help of some gliding elements, the naughty girl.
机译:铁路主干道的装卸,运输和安装方法不需要在每个焊接带卸载周期后使铁路主干道更近,在已安装车道的尽头停止直到所有BLS完全卸载。一种方法是将两条车道绑在一堆卸货车上,然后沿着车子拖把以方便它们下降到道路上。一台移动的射击和定位机在安装好的路段上留下了由车辆支撑的车道;这些车道从安装区移至顽皮区;从这些车道到它们的P段最后,在一些滑行元素的帮助下,调皮的女孩。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号