首页> 外国专利> Technical method statement describing early elavator installation and operation process by utilizing early contruction of elevator core structure

Technical method statement describing early elavator installation and operation process by utilizing early contruction of elevator core structure

机译:利用电梯核心结构的早期构造描述早期电梯安装和运行过程的技术方法说明

摘要

According to the present invention, provided is an elevator core structure capable of pre-construction. The present invention includes: an elevator framework (120) separated from a main framework (110) as well as being extended in a longitudinal direction of the main framework (110); and a guide frame (130) formed on the inner surface of the elevator framework (120). The elevator framework (120) is formed when a plurality of framework segments (121) are stacked, and a guide frame unit (131) forming the guide frame (130) is mounted on a side of the framework segments (121). According to the present invention, the elevator framework can be pre-constructed without being affected by a schedule for the construction of the main framework.
机译:根据本发明,提供了一种能够预先构造的电梯核心结构。本发明包括:电梯框架(120),其与主框架(110)分离并且在主框架(110)的纵向上延伸。导向框架​​(130)形成在电梯框架(120)的内表面上。当堆叠多个框架段(121)时形成电梯框架(120),并且形成引导框架(130)的引导框架单元(131)安装在框架段(121)的一侧。根据本发明,电梯框架可以被预先构造而不受主框架的建造时间表的影响。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号