摘要

FIELD: mining.;SUBSTANCE: invention relates to mining and can be used in the development of mineral deposits in the chamber and pillar systems of development with the laying of the goaf. This goal is achieved by defining and strengthening only that part of the inter-chamber pillar in which its deformations exceed the permissible limits, that is, by partial laying of the developed space in the case of chamber development systems, for this, in accordance with the source data and the geometrical parameters of the backfill site, a plot of load distribution - γ1H and soil deposits - γ1H+γ2h on the roof of the reservoir is built, the allowable load (allowable pressure) on the ground pillar Pallow is determined, the line passing through the intersection point of these two graphs determines the minimum required bookmark level, and the tab itself of the worked-out space is produced below the intersection point of these diagrams, that is, where the calculated pressure on the cell is greater than the allowable one, taking into account the engineering calculation error equal to 20–30 %.;EFFECT: technical result is an increase in the efficiency of the backfilling operations by partially laying the worked-out space to the level of permissible pressure on the pillar ground.;1 cl, 1 dwg
机译:技术领域本发明涉及采矿,并且可用于在采空区的铺设中在矿床和矿柱系统中开采矿床。通过仅限定和加强腔间支柱的变形超过允许极限的那部分来实现该目标,也就是说,在腔室开发系统的情况下,为此部分地铺设已开发的空间回填点的源数据和几何参数,载荷分布图-γ 1 H和土壤沉积物-γ 1 H +γ 2 h,确定了地面支柱P allow 上的允许载荷(允许压力),通过这两个图的交点的线确定了所需的最小值书签级别,并且在这些图的交点以下生成了工作空间的选项卡本身,也就是说,考虑到工程计算误差等于20,计算出的单元格上的压力大于允许的压力–30%。;效果:技术成果是效率的提高通过将工作空间部分地铺设到支柱地面上允许的压力水平来回填作业的效率; 1 cl,1 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号