Final joint of immersed tunnel as well as prefabrication method and installation method

机译:沉管隧道的最终节点以及预制方法和安装方法

摘要

The present application discloses a final joint of an immersed tunnel, a prefabrication method and an installation method, wherein the final joint includes two end surfaces connected with installed adjacent tube sections; the two end surfaces are both tilted surfaces, so that the longitudinal profile of the final joint along an installation direction is of an inverted trapezoid structure; and the final joint further may be of a structure with a tube section I and a tube section II which are connected with each other. The final joint of the immersed tunnel is simple in structure, convenient to control and relatively high in precision, thereby reducing lots of open sea diving work and lowering a risk of installation quality defects; as prefabrication procedures are simple, the final joint may be prefabricated in a land factory and then transported to the site, thereby reducing influence of weather conditions on construction; a body structure of the final joint is prefabricated in the factory, and then the overall final joint is transported to the site for installation; water stop systems realize quick water stop, thus forming a dry construction environment; and therefore, the influence of weather and tidal current conditions on a project may be reduced, and a quality risk may be lowered.
机译:本发明公开了一种沉管隧道的最终接头,预制方法和安装方法,该最终接头包括与安装的相邻管段相连的两个端面。所述两个端面均为倾斜面,使得最终接头沿安装方向的纵向轮廓为倒梯形结构。最终的接头还可以具有管段I和管段II彼此连接的结构。该沉管隧道的最终接头结构简单,控制方便,精度较高,从而减少了很多露天作业,降低了安装质量缺陷的风险。由于预制过程很简单,因此最终接头可以在土地工厂中预制,然后运输到现场,从而减少天气条件对施工的影响;最终接头的主体结构是在工厂预制的,然后将整个最终接头运送到现场进行安装;止水系统可实现快速止水,从而形成干燥的施工环境。因此,可以减少天气和潮流条件对项目的影响,并可以降低质量风险。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号