The present invention relates to a yurt construction method and a yurt constructed by the same which facilitate installation and drastically reduce a construction period and costs. The yurt construction method comprises: a steel plate installation step of erecting and installing a steel plate of an arc shape at a construction position; a square pipe coupling step of coupling a square pipe to the inner surface of the steel plate at a set height from a floor; a concrete pouring step of pouring concrete up to below the position of the square pipe coupled to the inner surface of the steel plate; a skirting board coupling step of coupling a skirting board to the upper surface of the square pipe; a floor finishing material installation step of installing a floor finishing material between the concrete and the skirting board after curing the concrete; a grid wall installation step of installing a partially opened grid wall on an upper portion of the skirting board; a door installation step of installing a door on an opened portion of the grid wall; a rafter installation step of installing a rafter on an upper portion of the grid wall; and a cover installation step of installing a cover consisting of a plurality of layers of insulators on the outside of the grid wall and the outside of the rafter.;COPYRIGHT KIPO 2020
展开▼