首页>
外国专利>
/ Performance monitoring system and method using compensation in thermal power plant and combined cycle power plant
/ Performance monitoring system and method using compensation in thermal power plant and combined cycle power plant
展开▼
机译:/火电厂和联合循环电厂使用补偿的性能监测系统和方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
An embodiment of the present invention is an invoice-based fuel information providing server for generating invoice-based coal information, which is fuel information used for energy generation on an invoice basis, and invoice-based gas information, which is fuel information used for combined power generation, on an invoice basis; An analysis reference fuel information providing server for generating analysis reference coal information, which is coal information that analyzes the composition of coal at the time of use of energy generation, and analysis reference gas information, which is gas information that analyzes the component of gas at the time of use of combined power generation; And applying the invoice-based bullet information and the energy generation operation measurement data to a preset performance calculation engine, and applying the invoice-based energy plant performance value, the invoice-based gas information and the combined power generation operation measurement data to the performance calculation engine. Calculate and store the performance value of the complex power plant based on the invoice for each set monitoring cycle, and apply the analysis standard coal information at the time of use of energy generation and the measurement data of the operation of energy generation at the time of use of energy generation to the performance calculation engine to analyze the performance value of the power plant. And, the analysis standard complex power plant performance value calculated by applying the analysis reference gas information at the time of use of the combined power generation and the measurement data of the combined power generation operation at the time of using the combined power generation to the performance calculation engine is calculated and stored for each set use time, and the The invoice-based bullet information is corrected by comparing the error between the invoice-based energy plant performance value and the analysis-based energy plant performance value, and the invoice-based gas information is calculated by comparing the error between the invoice-based composite power plant performance value and the analysis-based composite power plant performance value. It may include; a power plant performance evaluation server to calibrate.
展开▼