首页> 外文OA文献 >The impacts on freight train operational performance of new rail infrastructure to segregate passenger and freight traffic
【2h】

The impacts on freight train operational performance of new rail infrastructure to segregate passenger and freight traffic

机译:新的铁路基础设施将客运和货运分开的对货运列车运行性能的影响

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Rail freight has an important role to play in improving the resource efficiency and sustainability of freight transport within the supply chain. The British rail network has seen considerable growth of both freight and passenger activity in the last 20 years, leading to concerns about its capacity to absorb continued growth. A number of infrastructure initiatives focused on increasing capacity and reducing conflicts have been implemented. This includes the North Doncaster Chord, opened in June 2014 primarily to provide a more direct route from the port of Immingham to the major Aire Valley power stations (i.e. Drax, Eggborough and Ferrybridge).The paper analyses the freight impacts of the new chord, focusing on three key operational measures (i.e. train routing, scheduled journey times and train punctuality) during 10-week survey periods before and after the opening of the chord. The analysis is based on real-time data relating to coal and biomass trains operating between Immingham and the three power stations. This is a novel approach as the data have been made publicly available only recently, allowing a detailed investigation of the flows on this corridor at a highly disaggregated level. The use of this empirical method to assess the detailed rail freight operational impacts is an important element in the process of evaluating the effects of network enhancement. The results demonstrate improvements in each of the three operational measures, but also reveal a situation considerably more complex than that suggested by the published material relating to the justification for this new infrastructure.
机译:铁路货运在提高供应链中的资源效率和货运可持续性方面可发挥重要作用。在过去的20年中,英国铁路网络的货运和客运活动均出现了可观的增长,这引起了人们对其吸收持续增长的能力的担忧。已经实施了许多旨在提高能力和减少冲突的基础设施举措。其中包括于2014年6月启用的北唐卡斯特和弦,其主要目的是提供一条从伊明汉姆港到主要的艾尔谷发电厂(例如德拉克斯,埃格伯勒和费里布里奇)的更直接路线。本文分析了新弦的货运影响,在和弦打开之前和之后的10周调查期间,重点关注三个关键操作措施(即火车路线,预定的行程时间和火车守时)。该分析基于与Immingham和这三个发电站之间运行的煤炭和生物质能火车有关的实时数据。这是一种新颖的方法,因为仅在最近才公开提供数据,从而可以在高度细分的层次上详细研究此通道上的流量。在评估网络增强效果的过程中,使用这种经验方法来评估详细的铁路货运运营影响是一个重要因素。结果表明,这三种操作措施均得到了改进,但也表明,这种情况要比已发布的有关该新基础架构合理性的材料所建议的情况复杂得多。

著录项

  • 作者

    Woodburn, A.G.;

  • 作者单位
  • 年度 2017
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号