首页> 外文OA文献 >From green park to theme park? Evolving legacy visions for London's Olympic Park
【2h】

From green park to theme park? Evolving legacy visions for London's Olympic Park

机译:从绿色公园到主题公园?伦敦奥林匹克公园不断发展的传统愿景

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The long time frames and complexity of urban mega-projects mean that plans inevitably change over time. Analysing the evolution of these projects allows the key factors that influence contemporary urban development to be identified; including the influence of shifting political and economic contexts. This paper examines the evolving conception of London’s Olympic Park: it identifies and accounts for key changes in the direction of this project. Although plans for the Park remained remarkably consistent between 2004 (when the bid was submitted) and 2014 (when the Park opened to the public), there were also subtle changes to the vision for and design of the Park. The research undertaken here identifies and explains one key shift - away from the original promise of large parklands and a blueprint for sustainability, towards a more bombastic, iconic landscape that is organised and promoted as a destination. This shift is partly explained by the evolving governance of the project, but it is also explained by the different priorities evident at different stages. In the early years (2004-7), the priorities were to impress the International Olympic Committee and to get a sceptical public onside. Hence, the initial emphasis on parklands and environmental sustainability. Later (2008-2012), the key priorities were securing income streams and financial sustainability. These issues are explored here using key ideas from geographical and architectural literature: including Sorkin’s notion of theme park urbanism, but also territorialisation and brandscaping. Through the detailed analysis of the London case study, the paper makes some important observations about the problems encountered when mega-events are used to lead urban development. The paper also highlights the challenges faced by designers and managers of urban parks; in particular the requirement for parks to be self-financing. Finally, the case explores - and helps explain - the contemporary obsession with iconic landscapes.
机译:城市大型项目的时间较长且复杂,这意味着计划不可避免地会随着时间而变化。通过分析这些项目的发展,可以确定影响当代城市发展的关键因素。包括不断变化的政治和经济环境的影响。本文研究了伦敦奥林匹克公园不断演变的概念:它确定并说明了该项目方向的主要变化。尽管公园的计划在2004年(提交投标之时)和2014年(公园向公众开放之时)之间保持了显着的一致性,但公园的愿景和设计也发生了细微的变化。此处进行的研究确定并解释了一个重要转变-从最初的大公园景观和可持续性发展蓝图转变为更具野性的标志性景观,并将其组织并推广为目的地。这种转变在一定程度上是由项目的不断发展的治理解释的,但也有在不同阶段出现的不同优先事项的解释。在最初的几年(2004-7年),工作重点是给国际奥委会留下深刻的印象,并使公众持怀疑态度。因此,最初的重点是公园和环境的可持续性。后来(2008-2012年),关键的优先事项是确保收入流和财务可持续性。在这里,这些问题是使用地理和建筑文献中的关键思想进行探讨的:包括索尔金的主题公园城市化概念,还包括地域化和品牌塑造。通过对伦敦案例研究的详细分析,本文对使用大型活动引导城市发展时遇到的问题进行了重要观察。本文还强调了城市公园的设计师和管理者所面临的挑战;特别是要求公园必须自负盈亏。最后,该案例探索并帮助解释了当代对标志性景观的痴迷。

著录项

  • 作者

    Smith, A.;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"English","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号