Thermal pollution abatement evaluation model for power plant siting

机译:电厂选址热污染治理评价模型

摘要

A thermal pollution abatement model for power plant siting is formulated to evaluate the economic costs, resource requirements, and physical characteristics of a particular thermal pollution abatement technology at a given site type for a plant alternative. The model also provides a screening capability to determine which sites are feasible alternatives for development by the calculation of the resource requirements and a check of the applicable thermal standards, and determining whether the plant alternative could be built on the available site in compliance with the thermal standards. The thermal pollution evaluation model analyzes the abatement technologies of surface discharge, diffuser, cooling pond, spray canal, and wet mechanical draft cooling towers. The typical site types evaluated are a river, small lake, great lake, coastal, estuary, offshore ocean, and water poor site. The model will be used in conjunction with a Plant Evaluation Model, which analyzes the effects of fuel costs and air pollution abatement, a Plant Expansion Model, and a Generation Expansion Model to determine the optimal operating and generating plan for an electric utility. The model may also be used in conjunction with the Plant Evaluation Model to evaluate the trade offs between the dollar cost of electric power generation, reliability, and air and thermal pollution. The model may also be used to determine, for a single plant site alternative, which abatement technologies would be feasible, and to make an economic and resource requirement comparison between these alternatives. Finally, the model could be used to examine the economic and locational aspects of the implementation of a plan limiting the waste heat discharge to natural bodies to zero discharge.
机译:拟定了用于电厂选址的热污染减排模型,以评估给定站点类型下替代电厂的特定热污染减排技术的经济成本,资源需求和物理特性。该模型还提供了筛选功能,可通过计算资源需求和检查适用的热能标准来确定哪些场所是开发的可行替代方案,并确定是否可以根据热力条件在可用的场所建造工厂替代方案标准。热污染评估模型分析了地表排放,扩散器,冷却池,喷渠和湿式机械通风冷却塔的减排技术。评估的典型站点类型为河流,小湖,大湖,沿海,河口,近海和缺水站点。该模型将与“工厂评估模型”(用于评估燃料成本和减少空气污染的影响),“工厂扩展模型”和“发电扩展模型”结合使用,以确定电力公司的最佳运行和发电计划。该模型还可以与“工厂评估模型”结合使用,以评估发电的美元成本,可靠性以及空气和热污染之间的权衡。对于单个工厂现场替代方案,该模型还可用于确定哪种减排技术是可行的,并在这些替代方案之间进行经济和资源需求比较。最后,该模型可用于检查实施计划的经济和位置方面,该计划将对自然物体的废热排放限制为零排放。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号