首页> 外文OA文献 >Moving from conventional bus service towards bus rapid transit : establishing priorities
【2h】

Moving from conventional bus service towards bus rapid transit : establishing priorities

机译:从传统的公交服务转向公交快速公交:确定优先事项

摘要

This thesis structures a process to support transit agencies in their decision-making when improving their current conventional bus service (CBS) towards a higher quality system such as Bus Rapid Transit (BRT). Four major tasks were conducted as follows. First a literatu re review was performed to study relevant prior research and BRT cases in operation in Pittsburgh, Los Angeles, Bogota, Curitiba, and Ottawa. Second, and based on the case studies and literature review, eight key attributes and components of BRT systems were identified. The key attributes defined were: 1) right of way priority; 2) expedited boarding and alighting; 3) knowledge-based planning and operations; 4) high frequency; 5) high reliability; 6) distinct image; 7) connectivity; 8) land use integration. The physical bus components that could be changed in order to achieve these attributes were identified as the right-of-way, stops, vehicles, fare collection system, signal priority system, and automated vehicle location (AVL) system. The third task focused on developing a prioritization process to understand the variables that would lead to achieve the first two key attributes. All components but AVL systems were identified to impact these key attributes. The evaluation process to prioritize the critical variables of each component was based on the time savings and cost associated with their implementation. Time savings were evaluated from a user standpoint as the total travel time, including access time, waiting time, and in-vehicle time. Time savings for the agency were evaluated through running time reductions. Finally, the process was applied to Chicago transit Authority Express service 49 on Western Avenue in Chicago, IL. As a result, the implementation of the prioritized variables was recommended on two phases. The first phase (1- 3 years) includes reducing the stop spacing on the X49 route to increase coverage and demand, upgrade all buses used in the route to low-floor buses, expedite fare collection process through wider use of transit cards, implement active signal priority, implement preferential treatment for buses, and finally upgrade to contact-less smart cards. The second phase (3 - 5) years, includes implementing off-vehicle fare payment and conducting further analysis to determine the cost-effectiveness and feasibility of an exclusive lane operation.
机译:本论文构建了一个流程,以支持公交机构在将其当前的常规公交服务(CBS)改进为更高质量的系统(如公交快速公交(BRT))时进行决策。进行了以下四个主要任务。首先,对匹兹堡,洛杉矶,波哥大,库里提巴和渥太华开展的相关先前研究和BRT案例进行了文献复习。其次,根据案例研究和文献回顾,确定了BRT系统的八个关键属性和组成部分。定义的关键属性是:1)优先权; 2)加急上下车; 3)基于知识的计划和运营; 4)高频; 5)可靠性高; 6)形象鲜明; 7)连接性; 8)土地利用整合。可以更改以实现这些属性的物理总线组件被标识为通行权,站点,车辆,票价收集系统,信号优先系统和自动车辆定位(AVL)系统。第三个任务集中于开发优先级排序过程,以了解将导致实现前两个关键属性的变量。确定了除AVL系统外的所有组件,以影响这些关键属性。优先考虑每个组件的关键变量的评估过程基于节省的时间和与实施它们相关的成本。从用户的角度出发,将节省的时间作为总的旅行时间,包括访问时间,等待时间和车载时间进行评估。通过减少运行时间来评估该机构节省的时间。最后,该流程已应用于伊利诺伊州芝加哥市Western Avenue的Chicago Transit Authority Express服务49。结果,建议在两个阶段实施优先变量。第一阶段(1-3年)包括减少X49路线上的站点间距以增加覆盖范围和需求,将路线中使用的所有公交车升级为低层公交车,通过广泛使用公交卡来加快票价收集过程,实施主动信号优先,对公交实施优惠待遇,最后升级为非接触式智能卡。第二阶段(3-5年)包括实施车外票价支付并进行进一步分析,以确定专用车道运营的成本效益和可行性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号