Analyzing Multiple Product Development Projects Based On Information and Resource Constraints

机译:基于信息和资源约束的多产品开发项目分析

摘要

Product development (PD) and engineering design processes are often characterized by theinformation flowing among activities. In PD, this flow forms a complex activity web—a processthat can be viewed as a complex system. Most literature on the subject of information flow inPD focuses on a single project, where precedence information constraints (based solely onnecessary information and possible assumptions) determine the execution sequence for theactivities and the resultant project lead-time. In this paper, we consider multiple PD projects thatshare a common set of design resources. Especially in this setting, precedence informationavailability is insufficient to assure that activities will execute on time. We extend theinformation flow modeling literature by including resource availability. We model several PDprojects as a portfolio, where activity execution is based on both information and resourceavailability. We demonstrate the effects of accounting for resource constraints on bothindividual projects’ and portfolio lead-time distributions.
机译:产品开发(PD)和工程设计过程通常以活动之间流动的信息为特征。在PD中,此流程形成了一个复杂的活动网络,该过程可以看作是一个复杂的系统。 PD中有关信息流主题的大多数文献都集中在单个项目上,其中优先级信息约束(仅基于不必要的信息和可能的假设)确定了活动的执行顺序以及所产生的项目提前期。在本文中,我们考虑了多个具有相同设计资源集的PD项目。特别是在此设置下,优先级信息可用性不足以确保活动将按时执行。我们通过包括资源可用性来扩展信息流建模文献。我们将几个PD项目建模为一个投资组合,其中活动的执行基于信息和资源的可用性。我们展示了考虑资源限制对单个项目和投资组合提前期分布的影响。

著录项

  • 作者

    Yassine Ali; Browning Tyson;

  • 作者单位
  • 年度 2002
  • 总页数
  • 原文格式 PDF
  • 正文语种 en_US
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号