首页> 外文OA文献 >Expedite requests in Raytheon's North Texas supply chain
【2h】

Expedite requests in Raytheon's North Texas supply chain

机译:加快Raytheon北德克萨斯供应链的要求

摘要

In December 2004, a manager at Raytheon Company articulated in the form of an LFM (Leaders for Manufacturing) internship proposal his belief that someone should do something about the amounts of time and money that Raytheon's North Texas plants spent handling expedite requests-requests that someone provide goods or services more quickly than normal. This thesis attempts to summarize the thoughts, learnings, initiatives, and outcomes associated with the ensuing effort. In particular, a large section of the paper is devoted to a case study of the most involved initiative: the devising and implementing of a new dispatching method in one small but central operation in an organization with a long history of processing things first in, first out. While for the project team the compelling factor was achieving a specific dollar impact, the reader of this paper will probably be more interested in the methodology than in Raytheon's ROI. Research for this thesis was conducted during a six-month internship with Raytheon Company's Space and Airborne Systems Supply Chain Management group in McKinney, TX, and Dallas, TX. The internship was affiliated with the Massachusetts Institute of Technology's Leaders for Manufacturing (LFM) Program.
机译:2004年12月,雷神公司的经理以LFM(制造业领导者)实习的形式表达了他的建议,即他认为有人应该对雷神公司在北德克萨斯州工厂处理加速请求所花费的时间和金钱有所作为。比平常更快地提供商品或服务。本文试图总结与随之而来的努力相关的思想,学习,倡议和成果。特别是,本文的大部分内容都涉及最主动的案例研究:在长期以来始终以先入为主的组织中,在一个规模较小但集中的组织中设计和实施一种新的调度方法出来。虽然对于项目团队来说,吸引人的因素是实现特定的美元影响,但与Raytheon的ROI相比,本文的读者可能会对这种方法更感兴趣。本论文的研究是在雷神公司位于德克萨斯州麦金尼和德克萨斯州达拉斯的太空与机载系统供应链管理小组进行的为期六个月的实习中进行的。实习隶属于麻省理工学院制造业领袖(LFM)计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号