首页> 外文OA文献 >Cooperation under the RES Directive - Case study on a joint project: An offshore wind park in the North Sea (cooperation between the Netherlands, Belgium, UK, and Luxembourg):Task 4 report; A report compiled within the European project “Cooperation between EU MS under the RenewableEnergy Directive and interaction with support schemes”
【2h】

Cooperation under the RES Directive - Case study on a joint project: An offshore wind park in the North Sea (cooperation between the Netherlands, Belgium, UK, and Luxembourg):Task 4 report; A report compiled within the European project “Cooperation between EU MS under the RenewableEnergy Directive and interaction with support schemes”

机译:根据REs指令进行合作 - 联合项目的案例研究:北海的海上风电场(荷兰,比利时,英国和卢森堡之间的合作):任务4报告;欧洲项目“可再生能源指令下的欧盟成员国之间的合作以及与支持计划的互动”中汇编的一份报告

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This case study provides an overview of how cooperation on a large joint project could beimplemented. It seeks to make the descriptions as close to reality, hands-on and practical aspossible. That said, the case is not an actually ongoing case, but should be seen as a potential projectidea.The joint project consists of a 1000 MW offshore wind park located on Dutch territory, to beconnected to an offshore hub on Belgian territory. Belgium, the Netherlands and the UK will togetherundertake the joint project and share the production and the RES benefits. Belgium will be the drivingforce of the joint project, organising the necessary negotiations and initiatives. The country will alsoassume most risks related to the development of the wind park. Therefore, we assume that the jointproject will be shared in the following way: 40% to Belgium, 30% to the Netherlands, and 30% tothe UK. We further assume that Belgium can achieve to involve Luxembourg into the project viastatistical transfers, corresponding to 10% of the project.Because of the first mover character of such a joint project in the North Sea, with offshore electricityproduction connected to several countries, we discuss in detail the implications of the set-up and thecooperation. We assume that the countries cooperate on the joint project, but not on their supportschemes. The latter aspect might follow in a second step.We show that all involved countries can benefit from the joint project. Belgium benefits fromgaining access to additional wind resources, which will help meeting its ambitious RES target. TheNetherlands will benefit from the connection of the wind park to the Belgian offshore hub. This will beat lower cost than a connection to Dutch shore – in return, the Netherlands will though only receive30% of the wind production as compared to own development at the same site. The UK will gain anoption on additional offshore wind resources that may be at competitive prices. Luxembourg mighthave a benefit from using a concrete joint project for the import of RES benefits, as they are moretangible than for e.g. technology-neutral, ‘pure’ statistical transfers.Please note that this study serves as an example for the potential set-up, issues and solutions of jointoffshore wind projects in an offshore grid. This is case is highly hypothetical. The Netherlands isalready developing the Borssele site for offshore wind, according to the Dutch Energy Agreementand, more specifically, the agreements on offshore wind and the offshore grid.
机译:该案例研究概述了如何在大型联合项目上实施合作。它试图使描述尽可能接近实际,动手和实际可行。话虽如此,但该案并非真正的正在进行中的案件,而应被视为潜在的设想方案。该联合项目包括位于荷兰境内的一个1000兆瓦海上风电场,将与比利时境内的一个海上枢纽相连。比利时,荷兰和英国将共同承担该联合项目,并分享生产和RES的利益。比利时将成为联合项目的动力,组织必要的谈判和倡议。该国还将承担与风电场开发相关的大多数风险。因此,我们假设将以以下方式共享该联合项目:比利时40%,荷兰30%,英国30%。我们进一步假设比利时可以通过统计转移使卢森堡参与该项目,相当于该项目的10%。由于北海这样一个联合项目的先行者特征,海上发电与多个国家相连,我们讨论详细说明设置和合作的意义。我们假设这些国家在联合项目上进行合作,但在支持方案上没有合作。后一个方面可能需要进行第二步。我们表明,所有参与的国家都可以从联合项目中受益。比利时受益于获得更多风资源的机会,这将有助于实现其雄心勃勃的RES目标。荷兰将从风力发电场到比利时海上枢纽的连接中受益。与连接荷兰海岸相比,这将降低成本–作为回报,与同一个站点自己的开发相比,荷兰将仅获得风能产量的30%。英国将获得可能具有竞争力价格的其他海上风能资源。卢森堡可以通过将具体的联合项目用于RES利益的进口而受益,因为与RES利益相比,这些利益更为具体。技术中立的“纯”统计转移。请注意,本研究为海上网格联合海上风电项目的潜在设置,问题和解决方案提供了示例。这种情况是高度假设的。根据《荷兰能源协议》,更具体地说,是关于海上风电和海上电网的协议,荷兰已经在开发Borssele海上风电场。