首页> 外文OA文献 >Dynamic Loadability of Cable Based Transmission Grids
【2h】

Dynamic Loadability of Cable Based Transmission Grids

机译:有线传输网的动态负载能力

摘要

This thesis is the product of three years research within the field of dynamic loadability of cable based transmission grids. The report contains a summary of the three year PhD project which has been conducted in a collaboration between the Danish Transmission System Operator (TSO), Energinet.dk who has fully funded the research, and the Department of Electrical Engineering at the Technical University of Denmark (DTU). All content of this report has been produced by the author during the three years, either individually or in collaboration with the different professional partners. The PhD project was carried out at three main locations, the head quarters of Energinet.dk in Errits, DTU in Kgs. Lyngby and during a ve months external stay at Kinectrics in Toronto, Canada.At Energinet.dk I gained considerable knowledge about the practical considerations regarding design, installation and dynamic loadability of cables. Energinet.dk has also been the main location where discussions, about how to implement the ndings of the project into the real world, have taken place.At DTU most of the academical discussions within the project have taken place. This includes discussions about pure mathematical issues, cable technologyand software technical problems. DTU was also the place where most of the experimental work, for verication of the theoretical models, took place.For the external stay, which is a mandatory activity to obtain a PhD degree from DTU, I visited Kinectrics in Toronto, Canada. Kinectrics is a large consultancywho employ, among others, one of the experts within loadability calculations, Dr. George Anders. During my stay, I obtained much insight i into dynamic rating techniques, practical issues with loadability calculations and the mathematics behind. During the PhD project I supervised 2 master projects, as well as 5 special courses at DTU. Furthermore I created and taught a cable course, with approximately 25 students, throughout 13 weeks during the spring of 2011.The PhD project has until now contributed with 3 journal papers and 4 conference papers. Selected papers can be found in the appendix. This thesis is divided into 9 chapters, plus list of references, appendices, etc. References to literature are denoted in square brackets, e.g. [1], and equations are denoted in parenthesis, e.g. (1.2) where the 1 refers to the chapter number and the 2 refers to the specic equation in the chapter. Similarly gures and tables are referenced as e.g. gure 1.2 and table 1.2, where the 1 refers to the chapter number and the 2 refers to the specific gure or table in the chapter.
机译:本文是基于电缆的输电网动态载荷能力领域三年研究的产物。该报告包含了为期三年的博士项目的摘要,该项目是由丹麦传输系统运营商(TSO),已全力资助这项研究的Energinet.dk与丹麦技术大学的电气工程系合作进行的(DTU)。该报告的所有内容均由作者在过去三年中单独或与不同专业合作伙伴共同制作。博士项目在三个主要地点进行,分别是位于Errits的Energinet.dk总部和位于Kgs的DTU。 Lyngby以及在加拿大多伦多Kinectrics进行的五个月外部逗留期间。在Energinet.dk,我对电缆的设计,安装和动态负载能力的实际考虑有所了解。 Energinet.dk还是讨论如何将项目实现到现实世界中的讨论的主要地点。在DTU中,项目内的大多数学术讨论都已进行。其中包括有关纯数学问题,电缆技术和软件技术问题的讨论。 DTU也是验证理论模型的大部分实验工作的地方。对于外部停留(这是从DTU获得博士学位的一项强制性活动),我访问了加拿大多伦多的Kinectrics。 Kinectrics是一家大型咨询公司,除其他外,他聘请了可载荷性计算方面的专家之一George Anders博士。在我逗留期间,我对动态额定值技术,负载能力计算的实际问题以及背后的数学有了深刻的了解。在博士项目期间,我指导了2个硕士项目以及DTU的5个特殊课程。此外,我在2011年春季的13个星期内创建并教授了大约25名学生的电缆课程。该博士项目迄今已贡献了3篇期刊论文和4篇会议论文。所选论文可在附录中找到。本论文分为9章,以及参考书目,附录等清单。对文献的参考文献用方括号表示,例如: [1],方程式用括号表示,例如(1.2)其中1指章号,2指章中的特定方程。类似地,表和表被引用为例如。 gure 1.2和表1.2,其中1表示章号,2表示本章中的特定gure或表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号