首页> 外文OA文献 >Simultaneous frequency and capacity setting for rapid transit systems with a competing mode and capacity constraints
【2h】

Simultaneous frequency and capacity setting for rapid transit systems with a competing mode and capacity constraints

机译:具有竞争模式和容量限制的快速运输系统的同时频率和容量设置

摘要

The railway planning problem consists of several consecutive phases: network design, line planning, timetabling, personnel assignment and rolling stocks planning. In this paper we will focus on the line planning process. Traditionally, the line planning problem consists of determining a set of lines and their frequencies optimizing a certain objective. In this work we will focus on the line planning problem context taking into account aspects related to rolling stock and crew operating costs. We assume that the number of possible vehicles is limited, that is, the problem that we are considering is a capacitated problem and the line network can be a crowding network. The main novelty in this paper is the consideration of the size of vehicles and frequencies as variables as well as the inclusion of a congestion function measuring the level of in-vehicle crowding. Concretely, we present the problem and an algorithm to solve it, which are tested via a computational experience.
机译:铁路规划问题包括几个连续的阶段:网络设计,线路规划,时间表,人员分配和机车车辆规划。在本文中,我们将重点放在生产线计划过程上。传统上,线路规划问题包括确定一组线路及其频率,以优化某个目标。在这项工作中,我们将重点关注生产线规划问题,并考虑与机车车辆和机组运营成本相关的方面。我们假设可能的车辆数量是有限的,也就是说,我们正在考虑的问题是一个拥挤的问题,而线路网络可能是拥挤的网络。本文的主要创新之处在于考虑了车辆的大小和频率作为变量,以及包含了一种测量车辆拥挤程度的拥塞功能。具体而言,我们介绍了该问题以及解决该问题的算法,并通过计算经验对其进行了测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号