首页> 外文OA文献 >Building holarchies for concurrent manufacturing planning and control in EtoPlan
【2h】

Building holarchies for concurrent manufacturing planning and control in EtoPlan

机译:在EtoPlan中建立并发制造计划和控制的层次结构

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The increasing versatility in order characteristics calls for planning and control systems that are able to evolve in time. Traditional hierarchical systems are usually based on a function-oriented static control structure in which all orders and products are handled similarly. Due to the dynamically changing characteristics of manufacturing environments these static control structures are not suitable anymore. Hence, a concept description and a prototype implementation for concurrent manufacturing planning and control (EtoPlan) based on multiple and temporary hierarchies (holarchies) are presented. The alternative control structure allows among other things to bridge the gap between process planning and production planning. The EtoPlan order planning method explicitly models the uncertainty in the information due to incompleteness of process planning information and shop floor randomness.
机译:订单特征的多功能性不断提高,要求计划和控制系统能够及时发展。传统的分层系统通常基于面向功能的静态控制结构,在该结构中,所有订单和产品的处理方式相似。由于制造环境的动态变化特性,这些静态控制结构不再适用。因此,提出了基于多个和临时层次结构(并列)的并发制造计划和控制(EtoPlan)的概念描述和原型实现。除了其他方面,替代控制结构还可以弥合过程计划和生产计划之间的差距。 EtoPlan订单计划方法显式地建模由于流程计划信息不完整和车间随机性而导致的信息不确定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号