首页> 外文OA文献 >Some Experiences on BEPCII SRF System Operation
【2h】

Some Experiences on BEPCII SRF System Operation

机译:BEpCII sRF系统运行的一些经验

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The Superconducting Radio Frequency (SRF) system of the upgrade project ofBeijing Electron Positron Collider (BEPCII) has been in operation for almost 8years. The SRF system has accelerated both electron and positron at the designbeam current of 910 mA successfully, and a high beam intensity colliding of 860mA (electron)*910 mA (positron) has been achieved in April 2014. Many problemswere encountered during the operation, among which some were solved and someremain unsolved. This paper will describe some experiences on BEPCII SRF systemoperation, including the symptoms, causes and solutions.
机译:北京正电子对撞机(BEPCII)升级项目的超导射频(SRF)系统已经运行了近8年。 SRF系统已成功地以910 mA的设计束电流加速了电子和正电子,并且在2014年4月实现了860mA(电子)* 910 mA(正电子)的高电子束强度碰撞。在操作过程中遇到了许多问题其中一些已解决而另一些仍未解决。本文将介绍BEPCII SRF系统操作的一些经验,包括症状,原因和解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号