首页> 外文OA文献 >Transmission Expansion Planning Considering Energy Storage
【2h】

Transmission Expansion Planning Considering Energy Storage

机译:考虑储能的输电扩展规划

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In electricity transmission networks, energy storage systems (ESS) provide ameans of upgrade deferral by smoothing supply and matching demand. We develop amixed integer programming (MIP) extension to the transmission network expansionplanning (TEP) problem that considers the installation and operation of ESS aswell as additional circuits. The model is demonstrated on the well knownGarver's 6-bus and IEEE 25-bus test circuits for two 24 hour operatingscenarios; a short peak, and a long peak. We show optimal location and capacityof storage is sensitive not only to cost, but also variability of demand in thenetwork.
机译:在输电网络中,储能系统(ESS)通过平滑供应和满足需求来提供升级延期的手段。我们针对传输网络扩展规划(TEP)问题开发了混合整数编程(MIP)扩展,其中考虑了ESS的安装和操作以及其他电路。该模型在众所周知的Garver的6总线和IEEE 25总线测试电路上进行了两个24小时工作场景的演示;一个短峰,一个长峰。我们表明,最佳存储位置和存储容量不仅对成本敏感,而且对网络需求的可变性也很敏感。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号